Laserfiche WebLink
SWRCB,January 2002 Page of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: a Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: m Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: pry I{YxSp F5t � Equipment Resolution: 1 _ FS1 <br /> Y' <br /> SV�� <br /> Piping Run#MH* Piping Run# Piping Run It Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: 1�E <br /> Method and location of T6s� t3cc>Y <br /> piping-run isolation: ttJo.i Die <br /> Wait time between applying <br /> pressure/vacuum/water and �p h�tl lqJ <br /> startin test: <br /> Test Start Time: 10 AjL4 <br /> Initial Reading(Ri): -5 P15 <br /> Test End Time: l D : 11D A" <br /> Final Reading(RF): S 1'S 1 <br /> Test Duration: + w <br /> Change in Reading(RF-Ri): O p$ 1- <br /> Pass/Fail Threshold or / D Ps <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />