Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ❑Industry Standard Ill Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: {OC-oC-*3 r$ - STS Equipment Resolution: d.Ow:O1 <br /> # l R-tDE3' � Sum #Sum P#Sum # '67 SYS1SumP <br /> Sump Diameter: <br /> Sump Depth: �57 �i s , <br /> Sump Material: TIZf:71 ::FF1P <br /> Height from Tank Top to Top of �' Z7i H ZS <br /> Highest Piping Penetration: ( j <br /> Height from Tank Top to Lowest ' <br /> Electrical Penetration: <br /> Condition of sump prior to testing: G�,v z—, �- <br /> Portion of Sump Tested' 3P> l% <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes ❑No ❑NA Yes ❑No ❑NA Pes ❑No ❑NA J Yes ❑No ❑NA <br /> product and water)?` // <br /> Turbine shutdown response time SECT 3 i--,C-C. 3 S�;e. cSEG <br /> Is system programmed for fail-safe XYes ❑No ❑NA Yes ❑No ❑NA A Yes ❑No ❑NA ;4 Yes ❑No ❑NA <br /> shutdown?` <br /> Was fail-safe verified to be yes ❑No ❑NA NLYes ❑No ❑NAYes ❑No ❑NA Yes ❑No ❑NA <br /> o erational?` <br /> Wait time between applying <br /> pressure/vacuum/water and startingl fl M 1� l M 1 {�♦.{, t 1� (p M D Q) <br /> test: <br /> Test Start Time: {o; ce>A 9:2-a (o:383A, 10 ; S`$ALA <br /> Initial Reading(Rj): g,g 17.`, t • S j?,-Z-j 2.7ea `r •7730. <br /> Test End Time: fib; k57 dl-.L ; -�a Q4k {� �3 A[M l I ' )3 A3--{ <br /> Final Reading(RF): 1 , s� r 1 • $'14n ��ab o (e•ZZZ`F <br /> Test Duration: Is F1(IL) L5:-H t 1> ply <br /> Change in Reading(RF-Rj): 'DSU 3 't v,0003', d.orno G O •000 (v'r <br /> Pass/Fail Threshold or Criteria: -v.ady 't'-0.4P9:>z- t-/—oxyc-z , -�• n��- r <br /> Test Result: Pass ❑Fail Pass ❑Fail k Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA Wes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and -S-Yes ❑No ❑NA 'es 11No ElNA Yes ❑No ❑NA ElYes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />