My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANDATORY <br /> The B-1000 Series SingleWall UDC from S. Bravo Systems, Inc. MUST be installed <br /> by a Bravo Certified Installer. Get Certified at www.sbravo. <br /> DEC 0 5 2017 <br /> I NVIIZONNILNTALIIL'ALTH <br /> TABLE OF CONTENTS Dâ–º"PNIO(KILN I <br /> A) Sump leveling & cut down............................................................ p. 3-4 <br /> B) Piping & entry fittings.................................................................... p. 4 <br /> C) Testing penetration fittings............................................................ p. 4 <br /> D) Electrical conduit lines.................................................................. p. 5 <br /> E) Backfill & concreting...................................................................... p. 6 <br /> F) Shear valve adjustment................................................................ p. 6 <br /> were-2AFLAIN <br /> By Installing this product, you agree to the warranty terms found at: <br /> www.sbra vo.com/warranty <br /> SAFETY FIRSTI S. Bravo Systems, Inc. urges you to carefully adhere to the normal safety procedures and <br /> precautions followed by your company. Please follow the mandates and compliances decreed by OSHA, local, <br /> State and federal regulations regarding the use of this product <br /> LIMITED WARRANTY <br /> All containment systems sold by S. Bravo Systems,Inc. are warranted to be free from defects in material and <br /> workmanship for a period of one year from date of purchase.This warranty will be limited to the repair and replacement <br /> of Bravo parts only and will exclude all claims for labor or consequential damage. No other express warranties given <br /> and no affirmation of S. Bravo Systems, Inc.,or its agents and/or representatives,by words or action,will constitute a <br /> warranty. IT IS EXPRESSLY AGREED THAT THIS WARRANTY WILL BE IN LIEU OF ALL WARRANTIES OF FITNESS <br /> AND IN LIEU OF THE WARRANTY OF MERCHANTABILITY. <br /> This warranty is void if there is any evidence of modification,abuse,negligence,or improper installation. If any fittings or <br /> components,other than S. Bravo Systems approved fittings or components,are used in conjunction with any S. Bravo <br /> Systems product,the warranty pertaining to these products is immediately void. <br /> CORROSION WARRANTY <br /> Model Term Limitations <br /> B-1000-XX 30 years None. Can be exposed / submerged in fuel indefinitely. <br /> B-1000-E-XX 3 years Fuel must be removed within 30 days of exposure. <br /> 2 ii-61000-136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.