My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UPGRADE (E) VEEDER-ROOT TLS -350 -- <br />FUEL SYSTEM MONITORING PANEL <br />(N) MPD 3+1 DIESEL <br />UDC, TYP. OF (2) <br />(N) 2" DIESEL 3" SC FRP <br />(N) MPD 3+1 DIESEO' <br />UDC, TYP. OF (2) <br />EXISTING C -STORE <br />CASHIER <br />EMERGENCY PUMP SHUT <br />= SWITCH <br />r 20' MIN. PER ELECTRICAL CODE <br />N <br />(N) MPD 3+0 TYP. OF (2) <br />(E) 2 UDC'S TO REMAIN <br />14'-9" 12'-2" 14'-9" <br />3/4 : ❑ <br />1/2 <br />7---------------------------------1-9 ----- <br />SUMP PENETRATIONS (E)2"87 GASOLINE 3" SC <br />FOR ALL PIPING 3/4 7/8% <br />SEE NOV page 18 (E) 2" 91 GASOLINE 3" SC F <br />(E) 3" VAPOR RETURN <br />(N) MPD 3+0 TYP. OF (2) <br />(E) 2 UDC'S TO REMAIN <br />7/8 ❑ ; <br />Iu-- fi------------------------ <br />proximate limit (SUMP PENETRATIONS) <br />of demolition for ,FOR ALL PIPING 3/4 7/81 <br />MPD 3/4 7/8 I ,SEE NOV page 18 j <br />L -- --- <br />(E) ASPHALT CONCRETE PAVING <br />revisions <br />REMOVE VAPOR CAP & ADAPTER N 4/10/18 <br />INSTALL 150# THEADED PIPE CAP (E) CONCRETE TANK SLAB /�\ <br />ISOLATE DIESEL TANK VENT AT STACK (4) DW UST'S 10,000 GAL. / 1 4/17/18 <br />see F-6 Vent Stack TO REMAIN IN SERVICE <br />DIESEL LINE <br />Proximate Limit of demoltion <br />Z <br />e <br />N <br />—, PENETRATION <br />(NOV <br />for new diesel piping. see F-7 <br />Lu <br />FiberGlassSystems <br />`GENERAL INSTALLATION INSTRUCTIONSS <br />SEE NOV page 18 <br />IS MADE PART OF THIS SUBMITTAL <br />m <br />11/30/2017 <br />GASOLINE PIPING IS EXISTING SHOWN SCHEMATICALLY AT 35 LWT FOR <br />1/8 " = 1'-0" <br />CLARITY. DIESEL PIPING IS NEW AT 100 LWT FOR CLARITY. ROUTING OF DIESEL <br />,,,,,R.S.EAGAN <br />PIPING IS DICTATED BY SITE CONDITIONS AND THE DISCRETION OF THE FUEL <br />SYSTEMS CONTRACTOR. PIPING REWORKED FOR NEW UDC'S IS CONFINED <br />17-474 <br />NEAR THE ENTRY OF EACH (2) NEW UDC. <br />17474F4.4 <br />PRODUCT & VAPOR PIPING PLAN <br />F-4 <br />87 GASOLINE TANK TO BE <br />CAP SIP ON LINE <br />CAP VAPOR LINE <br />UJ <br />O <br />PUT TO DIESEL SERVICE <br />I I O <br />D <br />1 <br />_ <br />r <br />see Scope of Work. <br />PREPARE PER REGULATIONS <br />see notes sheet F-5 <br />Q <br />a <br />------I <br />I <br />L — — —— <br />(E) VAPOR <br />LINE <br />i <br />J - - - <br />I I I <br />- j <br />V <br />Z <br />O n <br />(N) 2" DIESEL 3" <br />SC FRP <br />TO REMAIN <br />; <br />, <br />—(E) SIPHON LINE <br />�. <br />w of M <br />tY W ,o <br />Q W <br />I <br />1"-- <br />— <br />- — <br />� <br />—T--- <br />--- —, <br />rn <br />M <br />FILL SUMP, TYP. OF (4) <br />; <br />w <br />Z Q U <br />�- <br />0 <br />87 <br />2 <br />-- <br />CAP 2" SIPHON LINE <br />AT SUMP ON TANKS <br />() <br />g t Y <br />O <br />d t- <br />#1 & #2 SEE F-5 <br />Q N <br />O <br />� <br />O <br />ZD <br />VJ <br />u <br />e <br />Z <br />_____ <br />_______ ______________-_________-_ <br />--------------------------------------- <br />- <br />a <br />v � <br />' <br />1 <br />t <br />� <br />c� z <br />p <br />DIESEL LINE MIN. 3" <br />OF OTHER PIPING <br />I <br />O <br />87 <br />i <br />I <br />I <br />W <br />Q <br />r <br />N NUT <br />g <br />' <br />1 <br />SEE NOV page 18 <br />I <br />> w <br />MMIUM <br />CANOPY LINE <br />1 <br />r---- ------ 0 <br />TANK ANNULAR, TYP. OF (4) a E' <br />__ PIPING SUMP v <br />CANOPY COLUMN Q� 4 ` TYP. OF (4) Z E <br />ICAL OF (4) z <br />2 <br />L------ -----------------J m <br />I o FILL SUMP, TYP. OF 4 � z <br />I <br />25775 PATTERSON PASS ROAD <br />10 <br />01 -LARDS, TYP. OF (8) 31'-0" <br />Z <br />e <br />N <br />(NOV <br />Lu <br />FiberGlassSystems <br />`GENERAL INSTALLATION INSTRUCTIONSS <br />IS MADE PART OF THIS SUBMITTAL <br />m <br />11/30/2017 <br />GASOLINE PIPING IS EXISTING SHOWN SCHEMATICALLY AT 35 LWT FOR <br />1/8 " = 1'-0" <br />CLARITY. DIESEL PIPING IS NEW AT 100 LWT FOR CLARITY. ROUTING OF DIESEL <br />,,,,,R.S.EAGAN <br />PIPING IS DICTATED BY SITE CONDITIONS AND THE DISCRETION OF THE FUEL <br />SYSTEMS CONTRACTOR. PIPING REWORKED FOR NEW UDC'S IS CONFINED <br />17-474 <br />NEAR THE ENTRY OF EACH (2) NEW UDC. <br />17474F4.4 <br />PRODUCT & VAPOR PIPING PLAN <br />F-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.