Laserfiche WebLink
SWRCB, January 2002 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 11 of <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer Q Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum 0 Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: TS -STS <br />Spill Box # 87-1 F Spill Box # 87-1 V <br />Equipment Resolution: 0.00" <br />Spill Box # 87-2 F Spill Box # 87-2.�. <br />Bucket Diameter: <br />12.00" <br />12.00" <br />12.00" <br />12.00" <br />Bucket Depth: <br />14.00" <br />12.00" <br />12.00" <br />12.00" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5min <br />5min <br />5min <br />5min <br />Test Start Time: <br />11:00am <br />11:00am <br />11:00am <br />11:00am <br />Initial Reading (Rj): <br />11.00" <br />10.00" <br />10.00" <br />10.00" <br />Test End Time: <br />12:00pm <br />12:00pm <br />12:00pm <br />12:00pm <br />Final Reading (RF): <br />11.00, <br />10.00" <br />10.00" <br />10.00" <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R <br />0.00" <br />0.00" <br />0.00" <br />0.00" <br />Pass/Fail Threshold or <br />Criteria: <br />0.0625" <br />0.0625" <br />0.0625" <br />0.0625" <br />Test Result: <br />Pass ❑ Fail <br />E] Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />