Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 7 of <br />Test Method Developed By: ❑ Sump Manufacturer D Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum D Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: TS -STS <br />Sump # 91 Sump # 87-1 <br />Equipment Resolution: 0.00" <br />Sump # 87-2 Sump # 87 slave <br />Sump Diameter: <br />48.00" <br />48.00" <br />48.00" <br />48.00" <br />Sump Depth: <br />72.00" <br />72.00" <br />72.00" <br />72.00" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />18.00" <br />18.00" <br />18.00" <br />18.00" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />40.00" <br />40.00" <br />40.00" <br />40.00" <br />Condition of sump prior to testing: <br />Clean dry <br />Clean dry <br />Clean dry <br />Clean dry <br />Portion of Sump Tested' <br />Highest penetration <br />Highest penetration <br />Highest penetration <br />Highest penetration <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)? . <br />❑ Yes ❑No DNA <br />❑Yes ❑No DNA <br />DYes ❑No DNA <br />[I Yes [I No DNA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />shutdown?* <br />❑Yes []No DNA <br />[]Yes[]No DNA <br />[]Yes[]No DNA <br />❑Yes 0 N DNA <br />Was fail-safe verified to be <br />oerational?* <br />❑Yes ❑ No DNA <br />❑Yes ❑ No DNA <br />❑Yes ❑ No DNA <br />[]Yes ❑ No DNA <br />Wait time between applying <br />pressure/vacutum/water and starting <br />test: <br />5min <br />5min <br />5min <br />5min <br />Test Start Time: <br />Initial Reading (R,): <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />SEE INCON RESULTS <br />Test End Time: <br />Final Reading (Rr): <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />0.002" <br />0.002" <br />0.002" <br />0.002" <br />Test Result: <br />D Pass ❑ Fail <br />D Pass ❑Fail <br />D Pass ❑ Fail <br />D Pass ❑ Fail <br />Was sensor removed for testing? <br />D Yes ❑No ❑NA <br />DYes []No [INA <br />DYes ❑No [INA <br />DYes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />DYes ❑ No ❑ NA <br />DYes []No ❑ NA <br />DYes ❑ No ❑ NA <br />DYes ❑ No [INA <br />Comments — (include information on repairs made prior to testing, and recommended follow-zip.for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />