My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 2:26:33 PM
Creation date
2/26/2019 12:19:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> g. 24-hour hydrostatic test (or equivalent) on tank#1 and tank#2 submersible turbine pump <br /> (STP) sumps, UDC 3/4, and UDC 7/8. Secondary containment testing for tank#1 fill sump <br /> maybe required if the installed threaded pipe cap riser has any impact on the secondary <br /> containment testing of this sump. <br /> h. Secondary containment testing of installed diesel piping (and any other regulated piping <br /> over which the concrete was broken) in operating condition (once concrete is poured), per <br /> manufacturer's guidelines. One hour pressure test per manufacturer's guidelines is <br /> required, if there are no manufacturer's guidelines, this test shall be performed using an <br /> applicable method specified in an industry code or engineering standard. As built plans <br /> must be submitted prior to this inspection. <br /> i. Since concrete will be broken near the converted diesel tank, a secondary containment test <br /> must be performed on the diesel tank (and any other tank over which the concrete has <br /> been broken) once concrete is poured in accordance with the manufacturer's guidelines. As <br /> built plans must be submitted prior to this inspection. <br /> j. Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code. If it is determined that a cold start is necessary, <br /> a copy of the alarm history shall be printed prior to performing the "cold start" of the Veeder <br /> Root system and made available at the time of EHD inspection. <br /> k. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br /> leak of 3 gallons per hour at 10 psi. <br /> I. Overfill prevention verification: Verify that external audio and visual alarm at the newly <br /> converted diesel tank activates when tank is 90% full. Overfill prevention set up calculations <br /> must be submitted to the EHD prior to scheduling this inspection. <br /> m. Verification of the dispenser footprints (UDCs 3/4 and 7/8) contained by the under <br /> dispenser containment sumps (UDCs), any potential leaks from piping and fuel filters must <br /> drain directly into UDCs. <br /> n. Visual inspection of the piping within the dispensers for any product leaks. <br /> o. An accurate and drawn to scale as-built drawing, which indicate the location of the <br /> underground storage tanks (underground storage tank, piping, auxiliary and monitoring <br /> equipment) and newly installed piping with respect to buildings or other landmarks (per 23 <br /> CCR 16 2711(8)) and copies of any required installation checklists must be submitted to the <br /> EHD prior to scheduling a final inspection. <br /> Please be aware that the facility cannot operate the UST system and receive fuel in the <br /> diesel tank prior to the EHD inspection and approval. <br /> 4. In addition, the sampling analytical results must be submitted within 30 days after the UDCs <br /> and piping sampling. Only results that come directly to the EHD from a third party California <br /> certified laboratory with affixed chain of custody will be accepted by EHD. <br /> 5. Within 30 days from each shipment of hazardous waste, all pertinent hazardous waste disposal <br /> documentation (rinsate and all residual product disposal) must be submitted to the EHD. <br /> 6. Secondary containment testing for STP sumps tank#1 and tank#2 sumps (where piping has <br /> been terminated), for the newly installed UDCs 3/4 and 7/8, and the installed diesel piping is <br /> required six months after installation. Secondary containment testing for tank#1 fill sump <br /> maybe required six months after installation if it's determined that such testing is needed during <br /> its installation. Provide 48 hours notification to the EHD when this test is scheduled. <br /> 7. Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.