t20 March 2015 <br /> AGE Project No. 00-0769 <br /> ' Page 2 of 19 <br /> ' • On 24 March 2014, the ozone injection system was removed from the site and <br /> sent back to the manufacturer for repairs and servicing; <br /> • On 04 April 2014, an alternate ozone injection system was delivered to the site <br /> and connected to the ozone wells on 11 April 2015; <br /> • On 15 April 2014, before the ozone injection pilot test could be re-initiated, it was <br /> ' determined that the alternate ozone injection system had a faulty boost air <br /> compressor and could not be put on-line; <br /> • On 24 April 2014, the alternate ozone injection system was removed from the <br /> site and replaced with the original ozone system after it had been repaired and <br /> serviced; <br /> • On 02 May 2014, the ozone injection pilot test was re-initiated; <br /> • On 03 June 2014, groundwater samples and geochemical parameters were <br /> ' collected and measured from wells MW-1, MW-2A, MW-3A, MW-5A, MW-6B, <br /> MW-7B, MW-8A, MW-9A, and MW-10 as required by the MRP; <br /> • On 01 July 2014, geochemical parameters were measured from wells MW-1, <br /> MW-2A, MW-3A, MW-5A, MW-6B, MW-7B, MW-8A, MW-9A, and MW-10 as <br /> required by the MRP; <br /> ' • On 04 and 05 August 2014, the third quarter 2015 semi-annual groundwater <br /> monitoring event was performed. Additionally, geochemical parameters were <br /> measured in wells MW-1, MW-2A, MW-3A, MW-5A, MW-6B, MW-7B, MW-8A, <br /> ' MW-9A, and MW-10 as required by the MRP; <br /> • On 04 September 2014, geochemical parameters were measured from wells <br /> MW-1, MW-2A, MW-3A, MW-5A, MW-6B, MW-713, MW-8A, MW-9A, and MW-10 <br /> tas required by the MRP; <br /> • On 02 October 2014, groundwater samples and geochemical parameters were <br /> ' collected and measured from wells MW-1, MW-2A, MW-3A, MW-5A, MW-6B, <br /> MW-7B, MW-8A, MW-9A, and MW-10 as required by the MRP; <br /> t • On 02 October 2014, the ozone injection pilot test was terminated; and <br /> • Between 02 May and 02 October 2014, the ozone system operated nearly <br /> continuously with minor shut downs. The ozone injection system operated a total <br /> of approximately 4,393 hours or 183 days during the pilot test; and ozone <br /> injection was distributed almost equally between OZ-1 through OZ-8 during the <br /> pilot test. <br /> 1 <br /> 2.0. PROCEDURES <br /> ' In June 2013, baseline groundwater monitoring and sampling was performed at the site <br /> in accordance with the MRP. Tabulated results are included in this report. Additional <br /> Advanced GeoEnvironmental Inc. <br />