Laserfiche WebLink
' 20 March 2015 <br /> AGE Project No. 00-0769 <br /> ' Page 3 of 19 <br /> ' information including analytical laboratory reports was included in the AGE-prepared, <br /> Semi-Annual Groundwater Monitoring Report - Second Quarter 2013 dated 19 August <br /> 2013. <br /> ' In June 2013 and January 2014, groundwater monitoring and sampling was performed <br /> at the site in accordance with the MRP; and in December 2013 geochemical parameters <br /> ' were collected from wells MW-1, MW-2A, MW-3A, MW-5A, MW-613, MW-713, MW-8A, <br /> MW-9A, and MW-10 as required by the MRP. Tabulated results are included in this <br /> report. Additional information including analytical laboratory reports was included in the <br /> t AGE-prepared, Semi-Annual Groundwater Monitoring and Progress Pilot Test Report - <br /> First Quarter 2014 dated 07 March 2014. <br /> tOn 03 June 2014, 04 and 05 August 2014, and 02 October 2014, progress monthly <br /> monitoring and sampling events were performed utilizing wells MW-1, MW-2A, MW-3A, <br /> MW-5A, MW-6B, MW-713, MW-8A, MW-9A, and MW-10 as required by the MRP. <br /> t Groundwater samples and geochemical parameters were collected from the above- <br /> mentioned wells. <br /> ' On 01 July 2014 and 04 September 2014, progress monthly monitoring events were <br /> performed utilizing wells MW-1, MW-2A, MW-3A, MW-5A, MW-613, MW-713, MW-8A, <br /> MW-9A, and MW-10 as required by the MRP. Geochemical parameters were collected <br /> ' from the above-mentioned wells. <br /> On 04 and 05 August 2014, the third quarter 2014 semi-annual groundwater monitoring <br /> ' event was performed utilizing single-completed wells MW-1 and MW-10, clustered <br /> monitoring wells MW-2A/B and MW-3A/B and multi-chambered (CMT) monitoring wells <br /> MW-4 (A-E), MW-5 (A-E), MW-6 (B-D), MW-7 (A-B), MW-8A, MW-9A, and MW-10. <br /> ' During the event, all thirty-two monitoring points were gauged for groundwater <br /> elevation. Additionally, geochemical parameters were collected from wells MW-1, <br /> ' MW-2A, MW-3A, MW-5A, MW-613, MW-7B, MW-8A, MW-9A, and MW-10 as required <br /> by the MRP (the third quarter 2014 semi-annual groundwater monitoring event was also <br /> a progress groundwater sampling event as required by the MRP). <br /> ' Monitoring and sampling was performed in accordance with the MRP (Appendix B) and <br /> AGE's standard monitoring and sampling procedures which are provided in Appendix C. <br /> ' Field data and logs are provided in Appendix D. No additional exceptions to AGE's <br /> standard procedures were noted. <br /> ' 3.0. FINDINGS <br /> ' Groundwater elevation, flow direction, and gradient were determined from field data <br /> collected in August 2014. Hydrocarbon-impact to groundwater was quantified by <br /> laboratory analytical data collected between June and October 2014. <br /> Advanced GeoEnvironmental Inc. <br /> 1 <br />