Laserfiche WebLink
M <br /> 0 <br /> SUMMARY OF MONITORING WELL CONSTRUCTION COST <br /> ROGER HUCKINS, OWNER <br /> SITE: 12018 CENTER STREET, STOCKTON CA <br /> SAMPLE ANALYSIS: EPA METHOD 8020, 50301801 5(M) <br /> DEPTH SAMPLES <br /> m MW#1B 80' 6 SAMPLE @ 55' , 60' , 65', 701, 7511 $0' <br /> 14 MW#2A 40' 7 SAMPLE @ 10', 151120% 251 , 301F 35', 400 <br /> MW#2B 55' 3 SAMPLE @ 4513 5012 55' <br /> MW#3A 40' 7 SAMPLE @ 101 , 15', 201, 25% 301, 351, 401 <br /> M MW#3B 55' 3 SAMPLE @461, 50,1554 <br /> MW#4A 40' 7 SAMPLE @ 1011 151, 20'1 25', 30', 351, 40' <br /> j MW#48 55' 3 SAMPLE @460, 501, 55' <br /> TOTALS 365' 36 SAMPLES <br /> COST SUMMARY Quanitity Unit Price/Unit Total for Item <br /> z DRILL AND INSTALL MONITORING WELLS 365 FT, Spectrum Quote $ 10,390.00 <br /> a SAMPLE AND ANALYSIS OF SAMPLES 36 EA, $60 .00 $2 , 160. 00 <br /> w SIX DAYS OF FIELD SUPERVISION BY FOOTHILL 6 EA. $810.00 $4,860. 00 <br /> w DEVELOPE WELLS 7 EA, 7 EA, $200. 00 $ 1 ,400. 00 <br /> SAMPLE GROUND WATER 8 EA. $200 .00 $15600. 00 <br /> w ANYLSIS OF WATER SAMPLES 8 EA. $60.00 $480, 00 <br /> REMOVE SPOIL - 20 BARRELS 20 EEA. $100. 00 $2,000.00 <br /> J ENGINEERING REPORTS 1 EA $ 1 , 580. 00 $1 , 500. 00 <br /> EXTRA SAMPLES AS MAY BE REQUIRED 4 EA. $60.00 $240.00 <br /> F MISC. ITEMS AND SUPPLIES 1 L.S. $ 1 , 500.00 $ 1 , 500. 00 <br /> o <br /> LL Total Estimated Cost $263130.00 <br /> s NOTES : <br /> ¢ 1 . DRILLING AND MONITORING WELL COST ARE SUPPORTED BY A ESTIMATE FROM SPECTRUM DRILLING <br /> ATTACHED TO THIS WORK SHEET <br /> ® 2. ALL OTHER ITEMS ARE ESTIMATED FROM THE COST OF PAST PROJECTS. <br /> s <br /> A <br /> W <br /> 3 <br /> II T <br /> m <br /> I $ <br /> M <br /> 2 $ <br />