Summary of Uncompleted work on This work Plan <br /> The approved work plan is not complete. Two deep wells and one shallow well, still need to be installed <br /> along with the soil & water sampling analysis for each. The two deep wells most likely will need to be <br /> drilled to over 100 feet to reach the bottom of the gasoline plume. If this trend continues, the scope of <br /> work required to define horizontal and vertical limits of this plume are much greater than originally <br /> estimated. <br /> Funds for the Work <br /> The elderly owner of the property, Mr. Huckins, has not paid for any of the above completed work on <br /> this work plan. The owner has told this consultant that he has no funds to complete this work plan and <br /> that all funds must come from the Underground Storage Clean-up Fund. With two-thirds of the work <br /> plan completed, we are at an impasse without funds from the Underground Storage Clean-up Fund. <br /> Please contact Ervin Rifenburg at Foothill Engineering, 209/368-9381 ifyou have any question on this <br /> request for reinbursement or any suggestion to resolve this matter. <br /> Respectfully submitted, <br /> Foothill gine ng <br /> ruin c g, , <br /> li <br /> cc: Roger Huckins <br /> cc: Michael Infmna San Joaquin County Public Health <br /> f <br /> t <br /> t <br /> I <br /> 2 <br />