r� <br /> Monitoring Well Installation Report—Former Unocal Station#0123,Tracy,CA <br /> January 17,2001 <br /> Depth to water during this monitoring event ranged from 9 34 to 10 64 feet bgs and groundwater flow <br /> was to the north at a gradient of 0 003, which is consistent with available historical data. <br /> I <br /> FIELD ACTIVITIES <br /> To further evaluate the downgradient extent of petroleum hydrocarbons in soil and groundwater at the <br /> site, GR installed two groundwater monitoring wells Field work was performed in accordance with GR's <br /> Site Safety Plan#240073 04, dated November 9, 2000 A copy of well installation permit#0024399 from <br /> the SJCPHS-EHD and encroachment permit #00522 from the City of Tracy are included in Appendix B <br /> GR Field Methods and Procedures are included in Appendix A Underground Service Alert was notified <br /> prior to beginning site activities The wells were installed by Cascade Drilling, Inc (C57 #717510) <br /> Groundwater monitoring wells U-7 and U-8 were installed on November 13, 2000 The well borings <br /> were drilled to a depth of 21 5 feet below ground surface (bgs) using a truck-mounted drill rig equipped <br /> with 8-inch-diameter hollow-stem augers A GR geologist observed the drilling activities Soil samples <br /> were collected from the well borings at 5-foot intervals for description and preparation of a log, and for <br /> possible chemical analysis Boring logs are included in Appendix C Locations of newly installed wells <br /> are shown on Figure 2 Copies of the Well Driller's Reports are included in Appendix C <br /> Soil cuttings generated during drilling activities were placed in 55-gallon drums Composite disposal <br />. confirmation sample SP-l(A-D) was collected from the soil cuttings Soil cuttings sampling procedures <br /> are presented in Appendix A <br /> Well Installation <br /> Groundwater monitoring wells U-7 and U-8 are constructed using 2-inch diameter Schedule 40 polyvinyl <br /> chloride (PVC) casing and 0 020-inch machine-slotted screen material The wells are screened from 5 to <br /> 20 feet bgs The annular space around the screens in each well is packed with Lonestar#3 graded sand <br /> The sandpack is followed by a seal of bentonite chips hydrated with clean water and concrete to ground <br /> surface The top of each well is protected by a vault box, locking well cap and lock The vault box is <br /> installed flush with the ground surface, and is set in concrete Well construction details are included with <br /> the boring logs in Appendix C <br /> Well Monitoring,Development and Sam Im <br /> The wells were developed and sampled on December 6, 2000 during the regularly scheduled quarterly <br /> monitoring and sampling event Depth-to-water was measured in all groundwater monitoring wells at the <br /> site and a potentiometric map was generated from the data (Figure 2) Each well was checked for the <br /> presence of separate phase hydrocarbons (SPHs) No SPHs were observed in the wells Neither of the <br /> newly installed wells dewatered during development Following development, groundwater samples <br /> were collected from each of the wells Purge water generated during development and sampling <br /> procedures was transported to Tosco's Rodeo refinery for disposal Well development procedures are <br /> included in Appendix A Copies of the well development forms are included in Appendix D Monitoring <br /> data are summarized in Table 2 <br /> 24007305-1 3 <br />