Laserfiche WebLink
SPILL PREVENTION, CONTROL,AND <br /> COUNTERMEASURES PLAN <br /> Valley Pacific Petroleum Services, Inc. <br /> 1512 Weiss Way <br /> Escalon, CA 95320 <br /> TECHNICAL AMENDMENT CERTIFICATION <br /> Refertorevision 5 on Compliance Inspection Plan Review Page <br /> [40 CFR 112.3(d)] <br /> My representative has visited the Facility and, being familiar with the provisions of 40 CFR Part 112, I <br /> attest that this Technical Amendment to the Spill Prevention, Control, and Countermeasures Plan(SPCC) <br /> Plan has been prepared in accordance with good engineering practices, including consideration of <br /> applicable industry standards, that procedures for required inspections and testing have been established, <br /> and this Plan is adequate for the Facility. <br /> Valley Pacific Petroleum Services, Inc. is solely responsible for implementation of this SPCC Plan <br /> Amended July 23,2019. <br /> Engineer: Robert J. b oµ0FE55! <br /> y?oO�Pt JCyH✓Fyn <br /> Signature: wp C 51592 0� m <br /> 6.GOR02D A <br /> t It <br /> Registration Number: C 51592 d} owl" �p <br /> 4�OFCAtIFpe'a <br /> State: California SEAL <br /> Date: July 23, 2019 <br /> ii <br /> R <br /> +.J* CONDOR <br />