Laserfiche WebLink
SPILL PREVENTION, CONTROL,AND <br /> COUNTERMEASURES PLAN <br /> Valley Pacific Petroleum Services, Inc. <br /> Banta Facility <br /> 23100 South Kasson Road <br /> Tracy, CA 95304 <br /> SPCC Plan Preparation Prior to Facility Becoming Operational? <br /> [40 CFR 112.3(b)(1)] <br /> ❑ Yes <br /> ® No <br /> Original Date of Plan: ...................................................................April 1994 <br /> Date of Last Plan Amendment/P.E. Certification: ........................July 23, 2019 <br /> Date of Last Plan Review: ............................................................March 21, 2016 <br /> Next Review Date on or Before: ................................................March 21, 2021 <br /> Designated Person Accountable for Spill Prevention: <br /> Mike Eliason <br /> Cardlock Manager <br /> (209)993-9793 <br /> Will Harp <br /> Terminal Manager/Northern Region <br /> (209)649-6356 <br /> CERTIFICATION <br /> [40 CFR 112.3(d)] <br /> My mpresentafive has visited the Facility and being familiar with the provisions of 40 CFR Part 112,I attest <br /> that this Spill Prevention,Control,and Countermeasures Plan(SPCC)Planhas been preparedin accordance <br /> with good engineering practices,including consideration of applicable industry standards,that procedures <br /> for required inspections and testing have been established, and this Plan is adequate for the facility. <br /> Valley Pacific Petroleum Services, Inc. is solely responsible for implementation of this SPCC Plan. <br /> Engineer: Robert..Job <br /> Signature: aryOFESS/ <br /> y?Q0.`PY JCy9<F2 <br /> ✓0 n <br /> Registration Number: C 51592 W 4 C 51592 m M <br /> A <br /> t E%P.6. 20 <br /> Y <br /> State: California 'tlq E+101L <br /> �CFCALIF <br /> Date: March 21, 2016 <br /> lll <br /> A <br /> W CONDOR <br />