My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23100
>
2800 - Aboveground Petroleum Storage Program
>
PR0516434
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 4:10:39 PM
Creation date
2/28/2019 11:34:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516434
PE
2832
FACILITY_ID
FA0010206
FACILITY_NAME
VALLEY PACIFIC PETROLEUM
STREET_NUMBER
23100
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906004
CURRENT_STATUS
01
SITE_LOCATION
23100 S KASSON RD
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prev W.,Cuntwl,ad Canlemwwres Plan <br /> vallry PW&IC Ptl Iwm Seview,M, <br /> Banta Pa`aly <br /> Page 4 <br /> Table 1 —Facility Oil Containers <br /> Container Volume ContainerA Discharge Prevention Discharge Controls's <br /> Contents (gallons) Identification <br /> • ASTs are double- <br /> walled and inherently <br /> self-contained. <br /> Diesel 15,000 T2 • Releases located <br /> (Photo 2) outside the tanks flow <br /> to the oil water <br /> • Oil transfers are to be separator or oil stop <br /> monitored by trained valve,then to the <br /> Valley Pacific storm water pond. <br /> personnel while • Valley Pacific <br /> product is being personnel are to be <br /> Gasoline 2,000 T3 transferred. trained in spill <br /> (Photo 3) • A tank liquid level <br /> gauge is to be visible response measures. <br /> by delivery • Spill kits are located <br /> driverstoperators. near oil storage areas. <br /> • Monthly visual • AST is double-walled <br /> inspections are to be and inherently self- <br /> conducted. contained. <br /> Biodiesel • Valley Pacific <br /> Photo 4 16,400 T4 personnel are to be <br /> trained in spill <br /> response measures. <br /> • Spill kits are located <br /> near oil storage areas. <br /> Portable Containers° <br /> • Totes are stored in the <br /> shop on spill pallets. <br /> • Oil transfers are to be • V alley Pacific <br /> monitored by Valley personnel are to be <br /> New Oil Tote Up to 660 1-2 totes Pacific personnel. trained in spill <br /> (Photo 4) (3M-gal wen) • Containers visually response measures. <br /> inspected for leaks • Adequately-sized <br /> monthly. spill kits are located <br /> near oil storage and <br /> handling areas. <br /> A <br /> +i1� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.