Laserfiche WebLink
Cesar Ruvalcaba [EH] <br /> From: Dana Schmidt <dschmidt@steeltank.com> <br /> Sent: Thursday, March 7, 2019 6:59 AM <br /> To: Garrison Reeves <br /> Subject: RE: 6th Edition SP001 rpt <br /> The checklists in Appendix C of both the 5th Edition and the 6th Edition are for use by the personnel at the tank site. See <br /> Section 6 that references the Appendix C checklists. <br /> Yes,you should review all of the items in the AST Record, Monthly Inspection Checklist and the Annual Inspection <br /> Checklist, but you are hired as an expert inspector and your inspection is to be more thorough. <br /> The details of what your Formal Inspections are found in Section 7 (and 8). Paragraph 7.1.2 states, <br /> "The following paragraphs describe minimum inspection guidelines. There are numerous AST configurations and <br /> components and it is the responsibility of the Certified Inspector to identify and properly inspect them to conform <br /> to the owner's requirements, industry standards and regulatory requirements, as applicable. The inspector or the <br /> inspection company shall develop detailed checklists that identify, record, and document all aspects of each <br /> inspection." <br /> Paragraph 7.8 (in the 5th Edition, or 7.10 in the 6th Edition) provides information about what your final report must <br /> include. <br /> "In the final report, include field data, measurements, pictures, drawings, tables, and an inspection summary. In <br /> the summary, identify unacceptable conditions and recommended and/or mandatory corrective actions. <br /> Determine the suitability for continued service of the AST per Section 10.0 and document this in the final report. <br /> Include the date of the next scheduled FEI or Fll, as applicable. Include the inspector's name and certification <br /> number in the report." <br /> The report that you provided did not conform to paragraph 7 (in either the 5th Edition or the 6th Edition) <br /> Dana Schmidt, P.E. <br /> Standards Engineer <br /> STI/SPFA <br /> N�� <br /> 944 Donata Court <br /> Lake Zurich, IL 60047 <br /> Direct Phone: (847) 550-3832 <br /> From: Garrison Reeves<greeves455@aol.com> <br /> Sent:Wednesday, March 6, 2019 11:22 PM <br /> To: Dana Schmidt<dschmidt@steeltank.com> <br /> Subject: 6th Edition SP001 rpt <br /> Is this what you want the report to reflect? It is from the 6th Edition Section 7 &8 without the internal inspection from <br /> Section 8. <br /> Thanks, Gary Reeves <br /> 209 661 6611 <br /> 1 <br />