My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2002 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:14:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2003
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />Prepare coupling fitting threads and attach Co -Flex termination fitting (male or female) to <br />connector/s or Direct Connection fitting and clamps. Tighten to specs. <br />Position pipe within trench for proper spacing. Lay out piping runs while maintaining <br />separation between pipe lengths and at crossover points. <br />TEST & CROSSOVER BOOT/TUBING INSTALLATION: <br />The Test/Crossover Assembly Boots are attached to the Co -Flex Piping ends to provide a <br />sealed access and test point for the interstitial/secondary space within the pipe. The <br />Test/Crossover Boots utilizes two (2) stainless steel band clamps which when tightened <br />around the primary or inner pipe jacket and the Co -Flex containment outer jacket isolate <br />the interstitial space. An air valve stem is installed in the boot for an outlet opening for <br />connecting the crossover and/or test tubes. These tubes are used for the testing of and the <br />interconnection of the interstitial space from pipe section to pipe section. Crossover tube <br />assemblies are used for junctions, pipe to pipe in line connections, piping run termination <br />points, tank connection points and any piping manifold connection points. <br />Test/Crossover Boots and tubes are fitted and tightened in place after the piping <br />terminations and their connections have been made. After installation and tightening of <br />all test/crossover boots and tubes, pressure testing may be done. Crossover tubes may be <br />removed to isolate each piping run if required. <br />PRESSURE TESTING PRIMARY AND SECONDARY <br />Typical primary piping testing is done at 50 psi fora m inimum of one (1) hour. Typical <br />secondary or interstitial space testing is done at 5 PSI for a minimum of one (1) hour. <br />These tests may be performed after installation is complete, but before backfill. Local <br />regulations and requirements may vary. Note: Care needs to be taken when pressurizing <br />the secondary, add pressure slowly and do not exceed 10 psi during pressurization <br />process. We recommend a small hand, bicycle type, pump to pressurize the secondary. <br />Always use safe procedures when pressure testing piping systems. Western Fiberglass, <br />Inc. assumes no liability or responsibility for testing procedures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.