Laserfiche WebLink
_09/18/2002 09:46 120936F'943 TANKNOLOGY PAGE 10/11 <br /> Monitoring System Cert=ification <br /> Site Address' 1987 W EST 11TH Date of Testing/Gervice: 09/16/2002 <br /> Results of Testing/Servicing <br /> software V9rzion Ir:;ra1'_ef23 <br /> Cam➢lete the following checklist: <br /> x Yes No Is the audible alarm operational? <br /> L,1 Ye? 17 No Is the visual alarm operational? <br /> Q Y^_s M No Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> Ye= 0 No interfere with their proper operation? <br /> Yes r,c r!1a If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping Systems,does the turbine automatically shut down if the piping secondary containment <br /> Yr.: Nc ❑ria monitoring system detects a leak,fails to operate,or Is electrically disconnected?If yes:which sensors initiate positive <br /> shutdown?(check all that apply) Q sump/french Sensors; ® Dispenser Containment Sensors. <br /> Did you confirm positive shutdown due to leaks a13 1 sensor failure/dlsconnectlon? ❑x Yat. No <br /> Y he `�� For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> © ❑ ❑ overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? 91 t <br /> ElYC!; ❑No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> LJ manufacturer name and model for all replacement parts In Section E,below_ <br /> ❑ Yc� Nc <br /> Was liquid found Inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. It yes,describe causes in Section E,below. <br /> © Yes ❑No Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable. <br /> © Yes 0 tae Is all monitoring equipment operational per manufacturers'specifications? <br /> Lon F below, describe how and when these deficiencns were ox will be correct*d.. <br /> E. Commenta: <br /> North PLLD on Reg is not testable at this time. <br /> Sensors in the Dispenser pans are not place correctly,Brackets not installed yet. I am certifying the sensors trip and shut down <br /> turbine as programed with the exception of the North PLLD on reg at this time. <br /> page 2 o: 3 <br />