My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2002 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:14:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2003
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/18/2002 09:46 120936'543 TANKNOLOGY PAGE 11/11 <br /> Monitoring system certification <br /> Site Address; 19,97 WEST 11TH Date of Testing/Service: 09/16/2002 <br /> in-Tank Gauging / SIR Equipment x❑ Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is Installed. <br /> This section must be completed If in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Q Yes DNo Has all input wiring bean Inspected for proper entry and termination,Including testing for ground faults? <br /> a Yea 7No Were all tank gauging probes visually Inspected for damage and residue buildup? <br /> Yes ONo Was accuracy of system product level readings tested? <br /> EIYQA EINo Was accuracy of system water level readings tested? <br /> 71 yQ; No Were all probes reinstalled properly? <br /> YQC EINo Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors (LLD) - Check this box if LLDs are not Installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> 0 Y`' ❑ �o ❑`r A (Check all that apply)Simulated leak rate; Q 3 g.p.h Q 0.1 g.p.h E]0,2 g.p.h <br /> x Yet O mo Ware all LLDs confirmed operational and accurate within regulatory requirements? <br /> 1-.L— <br /> M Yee FINo Was the testing apparatus properly calibrated? <br /> Ycc No [j]to,A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ElYPF ONo • ❑ri/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Ya. []No Nrn For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> 0 YeF []too F714/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> x❑Yes F71qo F7NiA For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> Q Yea ONO Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. comments: <br /> Michael Levesque <br /> VR Cert#000.00-5505 <br /> Tanknology Contractor Lic #743160 <br /> page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.