Laserfiche WebLink
0 <br />AUG -15-2006 14:01 Seruice Station Systems 408 938 8888 P.05 <br />Monitoring System Certification - F. 3 of 3 <br />Site Address: 1804 West 11Th. Street @ Corral Hallow Date of Testing/Servicing: 8/8/06 <br />F. In • Tank Gauging / SIR Equipment: an Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />r..mmnloto the Pnllnwinw chpcklicte <br />❑ Yes <br />❑ No* <br />Has all input wiring; been inspected for proper entry and termination, including; testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />13 Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />0 Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detector's (LI.D): 11 Check this box if LLD's are not installed. <br />f mmnlata the fnllnwino rhprk-lict- <br />® Yes <br />0 No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak reate: N 3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for eICetronie LLD start-up. <br />® Yes <br />13 No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />® Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />0 N/A <br />19 Yes <br />p No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />® Yes <br />❑ No* <br />For electronic LLD's. does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A <br />or disconnected? <br />M Yes <br />❑ No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ NIA <br />malfunctions or fails a test? <br />im Yes <br />❑ No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: Syphon Jets Replaced on All 4 Turbines <br />