Laserfiche WebLink
AUG -15-2006 14:01 Service Station Systems <br />408 938 8888 P.06 <br />Monitoring System Certification <br />UST Monitoring Site Plan <br />1804 West 11Th. Street @ Corral Hallow in Tracy <br />7128/06 <br />.................................... <br />.......... <br />. ....... . ...... <br />s <br />.................................. <br />............... <br />............. ..... ............... <br />. .......... '' ........ ...... '' <br />. ....... .......... . .......... <br />.. .. ...... A.. <br />Date map was drawn: V 11 <br />instructions <br />On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if <br />installed, monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detedtors; and in -tank liquid <br />level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />