Laserfiche WebLink
DEC-05-2011 10:30 SERVICE STATION 14089388888 P.07i10 <br /> 1l <br /> Y' <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer Industry Standard ❑ Professional Engineer �. <br /> ❑ Other(Specify) <br /> 1_;�. <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br /> UDC#1/2 UDC#3/4 UDC##5/6 UDC#7/8 ;a <br /> UDC Manufacturer: Wcstem fiberglass Western fiberglass Western fiberglass Western fiberglass - <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 31" 31" 31'' 31„ <br /> Height from UDC Bottom to Top 5" 5" 5" <br /> of Highest Piping Penetration_ <br /> Height from UDC Bottom to 12" 12" 12" 12" P <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to : <br /> testis Good Good Good Good .. -, <br /> Portion of UDC Tested 2" above piping 2"above piping 2" above piping 2"above Riping 71 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No ®NA 0 Yes ❑No ®NA ❑ Yes ❑No ®NA ❑ Yes❑No ®NA <br /> roduct and water)? ' <br /> Turbine shutdown res onse time N/A N/A N/A N/A :"'PY <br /> Is system programmed for fail- <br /> safe shutdown?* <br /> ❑ Yes Q No ®NA [jYes ❑ es No ®NA ❑Y ❑No ®NA ElYes Cl No O NA <br /> Was fail-safe verified to be <br /> o erational?- ❑ Yes❑No ®NA ❑Yes❑No IRNA ❑Yes ❑No ®NA ❑ Yes❑No ®NA <br /> Wait time between applying :f <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> '4 Y <br /> Test Start Time: 1:55 FRI 1:55 pm 1:55 pm 1:55 prn ' <br /> Initial Reading(R,): 3.0633 4.8881 2.2882 2.5990 <br /> Test End Time: 2:10 pm 2:10 pm 2:10 pm 2:10 pm r <br /> Final Readin RF): 3.0635 4.8880 2.2883 2.5990 <br /> Test Duration: 15 min. 15 min. 15 min. 15 min. <br /> n,f• , <br /> Chane in Reading(RF-Ri): +0.0002 -0,0001 +0,0001 None <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" +/-0.002" +/-0.00211 <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail Hl Pass ❑Fail ® Pass ❑Fail <br /> Was sensor removed for testing? ®Yes❑No q NA ®Yes❑No [INA M Yes❑No ❑NA ®Yes❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after test!u? ®Yds[INo p NA M Yes C3No C]NA ®Yes❑No ❑NA ®Yes LJNo ElNA:', x <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> "Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment testing scope of work". <br /> . r <br /> ` 'rl <br /> ♦.z <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Aay of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />