Laserfiche WebLink
SEP-03-2088 08:55 Service Station Systems 408 938 8928 P.05 <br /> Monitoring System Certification-P of 3 <br /> Site Address: 1804 West 11Th. Street @ Corral Hallow Date of Testing/Servicing: 8/4/08 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 123.00 <br /> Com tete the following checklist: <br /> M Yes ❑ NO Is the audible alarm operational? <br /> CK Yes ❑ No* Is the visual alarm operational? <br /> 11 Yes ❑ Noy` Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> tg Yes ❑ No's Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> cl Yes ❑ Noy' If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> 0 N/A operational? <br /> tH Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) M Sump/Trench Sensors; M Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor faihue/disconnection? a Yes 0 No <br /> CK Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so, at what percent of tank capacity does the alarm trigger? 90 % <br /> L.Y <br /> ❑ No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> M No Was liquid found inside any secondary containment systems designed as dry systems? (Check ull that apply) <br /> 0 Product;0 Water. If yes,describe causes in Section E,below. <br /> 0 No" Was monitorings stem set-upreviewed to ensure roper settings? (Attach set-upreports, if a licahle. <br /> ❑ No' Is all monitoring equipment operational per manufacturer's specifications'? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: 89 & 91 are Split Tanks & Share Annular. <br /> Replaced syphon jet valve on 87 STP <br />