My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
INSTALL 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:48 AM
Creation date
3/1/2019 8:01:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2008
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP-03-2008 08:55 Service Station Systems 408 938 8888 P.06 <br /> Monitoring System Certification -P of 3 <br /> Site Address: 1804 West 11Th. Street @ Corral Mallow Date of Testiag/Servicing: 814108 <br /> F. In»Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> d Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforni leak detection monitoring. <br /> Com tete the folio ing checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and tenuination, includung testing for ground faults? <br /> ❑ Yes ❑ No's Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product Ievel readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ Nos Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): p Check this box if LLD's are not installed. <br /> Com lete the folio ing checklist: <br /> M Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak reate:ix 3 g.p.h.(1.); 0 0.1 g.p.h. (2); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency, certification required only for electronic LLD start-Lip. <br /> lg Yes ❑ No* Were all LLD's confinned operational and accurate within regulatory requirements? <br /> (S Yes R No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No's For mechanical LLD's,does the I.LD restrict product flow if it detects a Ieak? <br /> a N/A <br /> Yes ❑ No* For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> *Yes ❑ No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> *Yes ❑ No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br /> Q N/A malfunctions or fails a test? <br /> *Yes ❑ No* For electronic LLD's, have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> OE Yes p No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.