Laserfiche WebLink
BIO NATIONAL CORPORATION <br /> Table of Contents <br /> 1 WORK. PLAN ON SITE BIOREMEDIATION OF NON-HAZARDOUS SOIL <br /> MATERIALON SITE ..........................................................4........................., 1 <br /> 1.1 SITE DESCRIPTION .......................................... ................................ 11 <br /> 1.2 TYPE OF CONTAMINATION ................................................................ 1 <br /> 1.3 PROPOSED TREATMENT SUMMARY .................................................... 1 <br /> 2 AIR POLLUTION CONSIDERATIONS ..........r..................................r........r.... 2 <br /> 2.1 The following data is an explanation of the air pollution <br /> parameters when dealing with bioremediation of hydrocarbons. ......... 2 <br /> 2.2 MONITORING VOLATILES RELEASED FROM THE BIOREACTOR HEAD <br /> SPACE ........ ...........................................................................0............... 2 <br /> 2 3 CALCULATIONS FOR AIR EMISSIONS AND HEALTH RISK ................. 3 <br /> 3 BIO NATIONAL ON SITE REMEDIATION SYSTEM PROCEDURE .................. 4 <br /> 4 SYSTEM COMPONENTS ........................................................a...............,... 5 <br /> 4.1 TANK AND PUMP SYSTEM ................................................................ p5 <br /> sSYSTEM CONTROL .........................•....r.............►....................................... 8 <br /> 5.1 NATURE'S CONTROL OF ITS OWN SYSTEM ....................................... 6 <br /> 5.2 MECHANICAL. AND HYDRAULIC CONTROLS ........................................ 7 <br /> • B OPERATIONAL PROCEDURES .......................................................... ..0. 8 <br /> 6.1 INSTALLA'T'ION OF THE SYSTEM .............................................. <br /> ..• 8 <br /> 6.2 ACTIVATION OF THE SYSTEM ................................................ ......... 8 <br /> 6.3 OPERATION OF THE SYSTEM ............................................................ 9 <br /> 6.4 PROGRESSIVE REMOVAL OF SOIL WHEN BELOW ACTION LEVEL. ..... 9 <br /> 7 BIOREMEDIATION COMPLETION AND ABANDONMENT ................................ 9 <br /> 7.1 WHEN CLEARANCE IS OBTAINED FOR COMPLETION OF STAGES OR <br /> FULL REMEDIATION, BEGIN ABANDONMENT PROCEDURE. ................ .... 9 <br /> 7.2 COMPLETE DOCUMENTATION AND FINAL REPORT .. .......... 10 <br /> 8 SIGNATURE SECTION ............................................................................... 11 <br /> 9 APPENDIX I - RECENT BIOREMEDIATION IN CHANNEL ISLANDS <br /> NATIONALPARK ........•..............r..r..........•.....r.............................................. 12 i <br /> 9.1 A 4" THICK LAYER OF BUNKER OIL BIODEGRADED FROM SEA � <br /> WATER RINSATE IN 28 DAYS ........................ ... .. ......... . .....I............... 12 <br /> 9.2 BACKGROUND: BIO NATIONAL CORPORATION TOOK PART IN THE <br /> CLEAN UP OF A FORMER AIR FORCE SITE ON SANTA ROSA ISLAND IN <br /> CHANNEL ISLANDS NATIONAL PARK, SANTA BARBARA, CALIFORNIA, <br /> COMPLETED APRIL 6, 1989. THE PROJECT IS SUMMARIZED AS <br /> FOLLOWS. ............................................................................................... 12 <br /> 10 APPENDIX IT - LABORATORY REPORTS ..................•...........................r... 12 <br /> t THOR901 <br />