My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001309
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:17:41 PM
Creation date
3/1/2019 4:31:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001309
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�p Swain - <br /> 1433 North Market Boulevard •Sacramento California 95834-1943 • (916)928-3300 • Fax(916)928 3341 <br /> May 30, 1996 <br /> Prole <br /> rty*,, <br /> Mr Kyle Christie MAY 3 11996 <br /> ARCO Products Company <br /> P O Box 612534 <br /> San Jose, California 95161 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Re Quarterly Creiiit2iwater Monitoring Report, First Quarter 1996, for ARCO Service Station <br /> No 2168,-Lozate4i' at 441 Charter Way, Stockton, California <br /> Dear Mr ChnspeOb <br /> This letter presents thsults of the first quarter 1996 groundwater monitoring and sampling <br /> program at ARCO.Prdhcts Company (ARCO) Service Station No 2168 at 441 Charter Way, <br /> Stockton, Callionua. The quarterly monitoring program is ui compliance with the San Joaquin <br /> County Public Health Services requirements regarding underground storage tank investigations. <br /> LIMITATIONS <br /> No monitoring event is thorough enough to describe all geologic and hydrogeologic conditions of <br /> interest at a given site if conditions have not been identified during the monitonng event, such a <br /> finding should not therefore be construed as a guarantee of the absence of such conditions at the <br /> site, but rather as the result of the scope, Limitations, and cost of work performed during the <br /> mdtnitonng event. <br /> Please call if you have any questions <br /> Sincerely, <br /> EMCON / <br /> e '-u'A <br /> Claudio Avila Jo son, R G. 5867 <br /> Project Geologist /ay <br /> enior o�ect Supervisor <br /> Attachments Quarterly Groundwater Monitoring Report, First Quarter 1996 <br /> SAC\N\,PJM805\08051460 7AS-95\m 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.