My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001309
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0001309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:17:41 PM
Creation date
3/1/2019 4:31:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001309
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> �YJ T <br /> Date May 30, 1996 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 02168 Address 441 Charter Way, Stockton, California _ <br /> ARCO Environmental Engineer Kyle Christie <br /> Consulting Co/Contact Person EMCONIJay R Johnson <br /> Consultant Project No 20805-146 007 <br /> Primary Agency/Regulatory ID No Mike Infurna, San Joaquin County Public Health Services <br /> WORKED PERFORMED THIS QUARTER (First- 1996) <br /> 1 EMCON performed quarterly groundwater sampling <br /> 2 EMCON compiled and evaluated groundwater monitoring data <br /> 3 EMCON observed the removal of the four underground storage tanks and associated product <br /> delivery lines <br /> WORKED PROPOSED FOR NEXT QUARTER (Second- 1996) <br /> 1 ARCO will continue to perform quarterly groundwater monitoring The next sampling event is <br /> tentatively scheduled for May 1996 Because wells MW-1 and MW-2, which were scheduled to be <br /> analyzed for halogenated volatile organic compounds (HVOC's), were inaccessible during the first <br /> quarter 1996, the wells will be analyzed for HVOC's during the second quarter EMCON will collect <br /> groundwater samples that will be analyzed for total petroleum hydrocarbons as gasoline (TPHG), and <br /> benzene, toluene, ethylbenzene, and total xylenes (BTEX) In addition, samples collected from wells <br /> MW-2 and MW-6 will be analyzed for total oil and grease (TOG) <br /> 2 EMCON will prepare a report summarizing the results and findings of the tank removal activities <br /> Current Phase of Protect Remediation <br /> Frequency of Groundwater Sampling Quarter) <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present On Site No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date None <br /> Approximate Depth to Groundwater 27 55 to 31 67 <br /> Groundwater Gradient Northeast <br /> 0 002 <br /> DISCUSSION (optional) <br /> Results of this monitoring event indicate that levels of dissolved gasoline hydrocarbons are consistent <br /> with levels detected during previous sampling events Groundwater gradient is consistent with previous <br /> sampling events Groundwater elevation increased approximately 2 77 feet from the previous sampling <br /> event (November 1995) <br /> ATTACHMENTS <br /> • Table 1 Groundwater Monitoring Data <br /> • Table 2 Results of Additional Analyses of Groundwater Samples <br /> • Figure 1 Site Location Map <br /> • Figure 2 Generalized Site Plan <br /> SACIN IPJ010805108051460 7AS-951dms 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.