My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012861
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
441
>
2900 - Site Mitigation Program
>
PR0544208
>
ARCHIVED REPORTS XR0012861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 6:15:48 PM
Creation date
3/1/2019 4:44:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012861
RECORD_ID
PR0544208
PE
2957
FACILITY_ID
FA0003628
FACILITY_NAME
ARCO STATION #2168*
STREET_NUMBER
441
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707607
CURRENT_STATUS
02
SITE_LOCATION
441 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Sequoia 895 Jarvis Drive <br /> Morgan Hill,CA 95037 <br /> Analytical FAX(408406}776-9600 <br /> 782-63DS <br /> r www.sequoialabs.com <br /> 15 November, 2005 <br /> �i <br /> Vernon P. Elarth <br /> URS Corporation [Arco1] <br /> F 2870 Gateway Oaks Dr., Ste 300 <br /> Il <br /> Sacramento, CA 95833 <br /> RE:ARCO#2168, Stockton, CA <br /> Work Order: MOK0278 <br /> 1�. Enclosed are the results of analyses for samples received by the laboratory on 11/08/05 09.45. if you <br /> have any questions concerning this report, please feel free to contact me. <br /> i Sincerely, <br /> Lisa Race <br /> Senior Project Manager <br /> f <br /> CA ELAP Certificate#1210 <br /> f <br /> II. The results in this laboratory report pertain only to the samples tested in the laboratory. The analyses <br /> contained in this report were performed in accordance with the BPGCLN Technical Specifications, <br /> applicable Federal, State, local regulations and certification requirements as well as the methodologies <br /> w as described in laboratory SOPS reviewed by the BPGCLN. This entire report was reviewed and <br /> approved for release. <br /> Page 1 of 7 <br /> a <br /> J <br /> r <br />} k <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.