Laserfiche WebLink
AROVS HL Ms.Victoria McCartney <br /> July 12,2007 <br /> • documentation of field activities performed in connection with the site <br /> assessment <br /> • conclusions relevant to the assessment objectives. <br /> Schedule <br /> ARCADIS BBL is prepared to initiate fieldwork upon County approval and receipt of <br /> all necessary permits. <br /> If you have any questions or comments regarding the contents of this letter,please <br /> contact either David Evans of ARCADIS BBL at 916.857.0124 extension 234 or by e- <br /> mail at david-evans@arcadis-us.com or David Lay of ARCADIS BBL at <br /> 315.671.9197 or by e-mail at david.lay@arcadis-us.com. <br /> Sincerely, pSs <br /> O q <br /> ARCADIS U.S., Inc. <br /> David M. ans ael P. Fleischner, P.E. <br /> Senior Project Manager Principal Engineer �4"�F• i ' <br /> Emimuas: <br /> Figure 1 Site Plan with Proposed Groundwater Monitoring Well Locations <br /> Figure 2 Generalized Shallow Monitoring Well Detail <br /> Figure 3 Generalized Double-Cased Monitoring Well Detail <br /> Attachment 1 Regulatory Correspondence <br /> Attachment 2 Groundwater Flow Direction Rose Diagram <br /> conies <br /> Ms.Stephanie Furgal,Chevron Environmental Management Company <br /> Mr. James Barton, Regional Water Quality Control Board <br /> Ms. Pearl Myer <br /> Page: <br /> cao�roarncmma_rorniw_+axra,•c 515 <br />