Laserfiche WebLink
® Stantec <br /> May 1,2015 <br /> Mr.John Yoakum <br /> Page 2 of 2 <br /> Reference: Well& Boring <br /> CopiesDoc Date Pages Description <br /> Work Plan <br /> 1 10/15/14 2 Extracted well decommissioning and installation tables from <br /> Addendum to Data Gap Assessment Work Plan <br /> 1 5/1/15 1 Site Plan <br /> 1 8 Historical Groundwater Monitoring & Analytical Data for <br /> Wells Proposed to Be Decommissioned via Pressure Grout <br /> 1 1 Photo of well CMW-2 <br /> 1 72 Well & Boring Permit Applications with checks for <br /> associated fees <br /> Two (B-28 and B-29) of the four soil borings to be advanced were not included in the work plans. <br /> However, the CVRWQCB requested in their October 30, 2014 letter that additional soil assessment <br /> be performed in the vicinity of the former waste oil tanks on the Chevron and Former ARCO site's. <br /> Borings B-28 and B-29 will be advanced to 10 ft. bgs at the locations shown on the attached figure <br /> to collect soil samples for analysis from each boring at 5 ft. and 10 ft. bgs. <br /> STANTEC CONSULTING SERVICES INC. <br /> C-2�u 66��� <br /> Jenni Woodmansee <br /> Staff Scientist <br /> Phone: (916) 384-0708 <br /> Fax: (916) 861-0430 <br /> Jenni.Woodmonsee@stantec.com <br /> Design with community In mind <br />