My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:03:38 PM
Creation date
3/4/2019 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantecesulting Services Inc. • <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Tel:(916)861-0400 <br /> Fax:(916)861-0430 <br /> RECEIVED- <br /> Stantec <br /> DEC 21 2012 <br /> December 19, 2012 ENVIRONMENTAL HEALTH <br /> PERMIT./SERVICES <br /> Mr. James Barton <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive, Suite No. 200 <br /> Rancho Cordova, California 95670 <br /> Subject: System Installation Activities Progress Report and Request for Extension <br /> Commingled Plume Account No. CP0057 <br /> Stockton Charter Way Commingled Plume Site <br /> Chevron Facility#92033 <br /> 508 West Charter Way, Stockton, California 95206 <br /> Project No. 211602057.500.0005 <br /> Dear Mr. Barton: <br /> On behalf of Chevron Environmental Management Company (CEMC), Stantec Consulting Services <br /> Inc. (Stantec) submits this Progress Report for ongoing remedial system installation activities at <br /> Chevron Facility#92033 of the Stockton Charter Way Commingled Plume Site. <br /> Activities Completed During October 2012 <br /> • Worked with the City of Stockton through September and October 2012 to check the status <br /> of the building permit review and to address comments. The building permit package, <br /> including design drawings, had been submitted to the City of Stockton on August 30, 2012 <br /> • Submitted the second part of the air sparge (AS) and soil vapor extraction (SVE) equipment <br /> procurement package on October 1, 2012 <br /> • Cleared fifteen (15) boreholes to a depth of eight feet via air-knife prior to drilling activities <br /> • Advanced fifteen (15) boreholes, installed five (5) vapor extraction wells (VE-2 through <br /> VE-6), and installed ten (10)AS wells (AS-3 through AS-12) <br /> Activities Completed During November 2012 <br /> • The City of Stockton issued the system installation building permit on November 9, 2012 <br /> • San Joaquin Valley Air Pollution Control District (SJVAPCD) issued Authority to Construct <br /> N-1122947 on November 13, 2012 for the soil vapor extraction system <br /> • Initiated construction activities on November 19, 2012 <br /> • Mobilized equipment and materials and completed private utility survey <br /> • Saw-cut trench routes to be excavated for underground piping (approx. 350 linear feet) <br /> • Demolished existing trash enclosure and removed debris <br /> • Removed asphalt and concrete paving at trenches and compound area (approx. 120 linear <br /> feet) <br /> • Initiated trench excavation for underground piping (approx. 120 linear feet) <br />
The URL can be used to link to this page
Your browser does not support the video tag.