My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:03:38 PM
Creation date
3/4/2019 11:16:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Construction Schedule(revised 12109112) <br /> Stockton Charter Way Commingled Plume 4 <br /> I <br /> Remediation System Installation <br /> 508 West Charter Way,Stockton,CA <br /> ID ;Task Name Duration Start Finish 11,12 Nov 18,'12 Nov 25,'12 Dec 2,'12 'Dec 9,12 Dec 16,'12 'Dec 23,'12 'Dec 30,'12 •Jan 6,'13 Jan 13 13 Jan 20 '13 Jan 27 13 <br /> TWTFS5MTWTF;SSMTW,T,.FESS.M_TW.T.F:S;SM.TWTF,SSMTW:TFSSMTWTFSS,MTWITFSSMTWTF.SSM.TWTFS;SMTWTFSSMTWT.F.S <br /> 1 Site Construction Activities 55 days Mon 11/19/12 Fri 211f13 - <br /> I <br /> 2 Mobilize to Site,Geophysical,Layout Trench Line 1 day Mon 11119/12 Man 11119112! <br /> 3 Sawcut Trenches and Compound Area 1 day Tue 11120712 Tue 11!20112 rr <br /> 4 Demo Trash Enclosure and Remove Concrete/Asphalt in Compound Area 1 day Wed 11121712 Wed 11/21/121' .J <br /> 5 Remove Asphalt in compound and trench to Knockout 1 day Wed 11121/12 Wed 11/211121 <br /> tui <br /> 6 Thanksgiving Holiday 2 days Thu 11122112 Fri 11/23/12 ; <br /> 7 Excavate Manifold Area and Trench to Knockout at Trench Split 1 day Mon 11126/12 Mon 11/26112 <br /> S <br /> 'Incident with Sub-surface conduit-Stop work and repair 2 days Tue 11127112 Wed 11/28/12? <br /> 9 Excavate Manifold Area and Trench to Knockout at Trench Split 1 day Thu 11129/12 Thu 11/29112 <br /> 10 Break out approximately 60'of Asphalt in trench parrallel to Lincoln-Rain Day 1 day Fri 11130112 Fri 11/30/12 <br /> 11 Excavate Manifold Area and footing for trash enclosure 1 day Mon 1213/12 Mon 1213112; I <br /> 12 Rain Day-no site activities 1 day Tue 1214!12 Tue 1214112 <br /> 13 Excavate Gas line bell hole and footing parralle€to gas line 1 day Wed 1215112 Wed 1215112 <br /> 14 Excavate Trench with Asphalt Removed 1 day Thu 1216!12 Thu 1216112 <br /> 15 Excavate Manifold area,PG&E connect gas line riser 1 day Fri 1217112 Fri 1217112 <br /> 16 Pipe manifold area and trench 3 days Man 12110/12 Wed 12/12/12 1 <br /> 17 install Rebar for trash enclosure 2 days Mon 12110/12 Tue 12/11/12 <br /> 'W <br /> 'l Pour Concrete 1 day Wed 12112/12 Wed 12112112+' s, <br /> 19 Install Blackwall and Chain Link Fence Enclosure 5 days Thu 12/13112 Wed 12/19112 ; <br /> 20 Pipe trenches 2 days Thu 12/13/12 Fri 12/14/12 i <br /> 21 Backfill Trenches 2 days Mon 12117112 Tue 12118112: i <br /> I <br /> 22 .Resurface Trenches 1 day Wed 12!19112 Wed 12/19112 <br /> 23 'Additional Days if required to complete any uncompleted tasks 2 days Thu 12/20/12 Fri 12}21112 <br /> 24 Christmas Holiday 15 days Mon 12/24/12 Fri 1111113 l <br /> 25 Breakout remaining Asphalt on Trenches 1 day Mon 1114113 Mon 1/14/131 <br /> 1 <br /> 26 _Excavate Trenches 3 days Tue 1115113 Thu 1!17!13 <br /> 27 Install Compound Equipment&Pipe Compound 2 days Fri 1/18113 Mon 1121113 <br /> � J <br /> 28 Complete Electrical 1 day Tue 1122113 Tue 1122113 I E�l <br /> 29 Pipe Trenches 2 days Wed 1123113 Thu 1124113: <br /> 30 Backfill Trenches 2 days Fri 1125113 Mon 1128113 <br /> 31 Complete Wellbox Installationiconnect€ons 2 days Tue 1129113 Wed 1130113 <br /> 32 Asphalt Trench Lines 1 da Thu 1131113 Thu 1131113 <br /> y <br /> 33 Clean-up and De-Mobilize 1 day Fri 2!1113 Fri 211113. <br /> Project:Projected Project Schedule-508 West Charter Way,Stockton(revised 120912) Task : : : = Progress Summary ® External Tasks Deadline <br /> _-='_ � <br /> Date:Sun 1219112 <br /> Split Milestone ® Project Summary <br /> External Milestone <br /> Page 1 <br /> Dates are arbitrary and are subject to change based on approval <br />