My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:15:01 PM
Creation date
3/4/2019 11:20:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 8, 1997 • • <br />Page 4 <br />• Search of Utility and Well Locations. PACIFIC will conduct a search <br />of underground utility locations which may influence the transport of <br />contaminants. Additionally, PACIFIC will conduct a search of well <br />records for all groundwater wells within 1/2 -mile of the site if not <br />previously conducted. <br />Soil Cuttings, Well Debris, and Rinse Water. Soil cuttings generated <br />during the destruction process will be properly disposed of at an <br />appropriate landfill by an approved Chevron contractor within 30 days <br />of generation. The cuttings will be stored on plastic sheeting onsite <br />until removed. Rinse water that may be generated from the washing of <br />augers will be stored in 55 -gallon DOT drums onsite and removal and <br />recycled by an approved Chevron contractor. The drums will be <br />removed within 30 days of generation. <br />Report. A report will be prepared after completion of necessary <br />field work. The report will include soil boring field notes, soil boring <br />location map, soil and groundwater analytical results, chain -of - <br />custody documentation, findings, copies of all applicable permits, <br />cross section diagrams depicting impacted areas, and a map of all , <br />water supply wells within a 1/2 -mile radius of the site. , 11y..t <br />Field and laboratory procedures are presented as Attachment A. <br />SCHEDULE <br />PACIFIC is prepared to initiate field work within 2 weeks following approval of this <br />work plan and issuance of permits by the City of Stockton Public Works Department <br />and the San Joaquin County Public Health Services. A report documenting the findings <br />of the soil boring and groundwater monitoring well installation, lithological <br />information, mass flux transects, historical and utility reviews. and aerial photo review <br />is anticipated to be submitted approximately 8 to 12 weeks after the commencement of <br />field work and upon completion soil analysis. <br />920-124.1 A/W KPLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.