My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
508
>
2900 - Site Mitigation Program
>
PR0536689
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 1:15:01 PM
Creation date
3/4/2019 11:20:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536689
PE
2957
FACILITY_ID
FA0021073
FACILITY_NAME
STKN CHARTER WAY COMMINGLED PLUME
STREET_NUMBER
508
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br />EMERGENCY CONTACT LISTING <br />Nature of Emergency Phone Number Alternate Phone Number <br />Ambulance <br />911 <br />Fire <br />911 <br />Police <br />911 <br />Poison Control Center <br />(800) 346-5922 <br />(800) 342-9293 <br />Office of Emergency <br />Services <br />911 <br />Chemical Spills <br />(800) 424-8802 <br />Hospital <br />(209) 944-5550 <br />911 <br />Other Contingencies <br />Pacific Environmental Group, Inc. (916) 858-2350 <br />12.0 TRAINING REQUIREMENTS <br />All personnel assigned to this project will be required to demonstrate that they have <br />completed the Initial Training Requirements (40 hours), according to Federal OSHA <br />Standards under 29 CFR 1910.120. <br />Field personnel from PACIFIC and their sub -contractors will attend a project briefing for <br />safety issues and project work task review before beginning work. All PACIFIC site <br />personnel shall have completed training relative to the project operations plans, and the <br />materials to be encountered during the project. <br />13.0 MEDICAL SURVEILLANCE <br />PACIFIC personnel and sub -contractors engaged in project operations shall be participants in <br />the Medical Surveillance program, and must be cleared by the examining physician(s) to <br />wear respiratory protection devices and protective clothing for working with hazardous <br />materials. The applicable requirements under Federal OSHA, 29 CFR 1910 will be observed. <br />A. Examination Requirements <br />All PACIFIC personnel on-site shall have successfully completed a pre -placement or <br />periodic medical examination in accordance with established PACIFIC policies and <br />procedures, and consistent with the provisions of the OSHA carcinogen standards. This <br />examination shall include a complete medical and occupational history, physical exami- <br />nation, and selected biological sampling. Laboratory studies include a complete blood count <br />920-124.1A/SSP.DOC 14 December 8, 1997 <br />
The URL can be used to link to this page
Your browser does not support the video tag.