Laserfiche WebLink
5.0 Comparison and Selection of Treatment Alternatives <br /> Four alternatives were identified and evaluated in Section 4.0 to assess their applicability to <br /> address the petroleum hydrocarbon contamination at the Transmission Shop site. As mentioned <br /> in Section 4.0, the alternatives were also ranked with the qualitative criteria—high, moderate, or <br /> low. Table 5-1 highlights the evaluation results for comparison among the alternatives. <br /> Table 5-1. Ranking and Comparison of Treatment Alternatives <br /> Alternative Technical Effectiveness Implementability Cost Overall <br /> Effectiveness(a) Ranking <br /> Groundwater Effective in reducing & Implementable but Expected to Moderate <br /> pump and treat bulk mass of COPCs in may take a long be high due to to Low <br /> gravelly,sandy soil layer time(more than six types of <br /> but limited in silty and months to a year equipment <br /> clayey soil layer; after completion of required and <br /> • May take a long time to system design) associated <br /> achieve target cleanup before treatment level of O&M <br /> goal; . begins due to air activities; <br /> • Overall effectiveness- and POTW Estimated <br /> moderate permitting ROM cost- <br /> requirements and $1.4 million; <br /> equipment <br /> fabrication; Overall cost <br /> effectiveness <br /> • May need a lot of -moderate to <br /> secured space for low <br /> equipment <br /> installation and <br /> operation; <br /> • Overall <br /> implementability- <br /> moderate to low <br /> Air sparging with Effective in reducing Implementable but Expected to Moderate <br /> SVE bulk mass of COPCs in may take a long be moderate <br /> gravelly,sandy soil layer time(more than six based on the <br /> but limited in silty and months to a year number of <br /> clayey soil layer; after completion of equipment <br /> • May take a long time to system design) anticipated <br /> achieve target cleanup before treatment and the <br /> goal; begins due to air associated <br /> • May require hydraulic and possible level of 0&M <br /> controls to prevent POTW permitting activities,but <br /> potential spreading of needs and could be high <br /> groundwater equipment if hydraulic <br /> contaminants; fabrication; control is <br /> • <br /> Overall needed; <br /> Overall effectiveness- <br /> moderate implementability- Estimated <br /> moderate ROM cost- <br /> $1.1 million <br /> Final FS_OnMe Petroleum HWrporbon Remedation 5-1 Shaw Environmental,Inc. <br />