My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 Comparison and Selection of Treatment Alternatives <br /> Four alternatives were identified and evaluated in Section 4.0 to assess their applicability to <br /> address the petroleum hydrocarbon contamination at the Transmission Shop site. As mentioned <br /> in Section 4.0, the alternatives were also ranked with the qualitative criteria—high, moderate, or <br /> low. Table 5-1 highlights the evaluation results for comparison among the alternatives. <br /> Table 5-1. Ranking and Comparison of Treatment Alternatives <br /> Alternative Technical Effectiveness Implementability Cost Overall <br /> Effectiveness(a) Ranking <br /> Groundwater Effective in reducing & Implementable but Expected to Moderate <br /> pump and treat bulk mass of COPCs in may take a long be high due to to Low <br /> gravelly,sandy soil layer time(more than six types of <br /> but limited in silty and months to a year equipment <br /> clayey soil layer; after completion of required and <br /> • May take a long time to system design) associated <br /> achieve target cleanup before treatment level of O&M <br /> goal; . begins due to air activities; <br /> • Overall effectiveness- and POTW Estimated <br /> moderate permitting ROM cost- <br /> requirements and $1.4 million; <br /> equipment <br /> fabrication; Overall cost <br /> effectiveness <br /> • May need a lot of -moderate to <br /> secured space for low <br /> equipment <br /> installation and <br /> operation; <br /> • Overall <br /> implementability- <br /> moderate to low <br /> Air sparging with Effective in reducing Implementable but Expected to Moderate <br /> SVE bulk mass of COPCs in may take a long be moderate <br /> gravelly,sandy soil layer time(more than six based on the <br /> but limited in silty and months to a year number of <br /> clayey soil layer; after completion of equipment <br /> • May take a long time to system design) anticipated <br /> achieve target cleanup before treatment and the <br /> goal; begins due to air associated <br /> • May require hydraulic and possible level of 0&M <br /> controls to prevent POTW permitting activities,but <br /> potential spreading of needs and could be high <br /> groundwater equipment if hydraulic <br /> contaminants; fabrication; control is <br /> • <br /> Overall needed; <br /> Overall effectiveness- <br /> moderate implementability- Estimated <br /> moderate ROM cost- <br /> $1.1 million <br /> Final FS_OnMe Petroleum HWrporbon Remedation 5-1 Shaw Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.