My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative Technical Effectiveness Implementability Cost Overall <br /> Effectiveness(a) Ranking <br /> • Overall cost <br /> effectiveness <br /> -moderate <br /> Biosparging Effective in reducing • Easily • Expected to High <br /> bulk mass of COPCs in implementable; be moderate <br /> gravelly,sandy soil layer . Should take no based on the <br /> but limited in silty and more than six expected level <br /> clayey soil layer, months after of O&M <br /> • May take a long time to completion of pilot activities; <br /> achieve target cleanup test and system • Estimated <br /> goal-, design to begin ROM cost- <br /> • Overall effectiveness- treatment; $0.6 million <br /> moderate No air or POTW • Overall cost <br /> permits needed, effectiveness <br /> minimizing lead - high <br /> time required; <br /> • Overall <br /> implementability- <br /> high <br /> In-situ chemical • Effective in reducing Implementable but Expected to Moderate <br /> oxidation bulk mass of COPCs in require a field pilot be high due to to high <br /> gravelly,sandy soil layer test to complete amount of <br /> but somewhat limited in system design-, oxidant likely <br /> silty and clayey soil Should take no used and the <br /> layer; more than six need to <br /> • May not take as long a months after address the <br /> time as the other completion of pilot COPC in the <br /> altematives to achieve test and system silty and <br /> target cleanup goal; design to begin clayey soil <br /> • Overall effectiveness- treatment; layer,along <br /> moderate to high Fewer permits with the <br /> needed than associated <br /> groundwater pump level of 0&M <br /> and treat and air activities; <br /> sparging with SVE Estimated <br /> -less lead time ROM cost- <br /> before treatment $1.0 million <br /> begins; Overall cost <br /> • May require effectiveness <br /> additional system -moderate <br /> control measures <br /> depending on <br /> permit <br /> requirements; <br /> • Overall <br /> implementability- <br /> moderate to high <br /> (a) The estimated ROM cost for each alternative is determined based on a treatment period of <br /> 15 years (anticipated worst case scenario) and an interest rate of 4% for present worth cost <br /> comparison purposes. <br /> Final FS_Onsae Petroleum Hydrocarbon RenWia0on 5-2 Shaw Environmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.