Alternative Technical Effectiveness Implementability Cost Overall <br /> Effectiveness(a) Ranking <br /> • Overall cost <br /> effectiveness <br /> -moderate <br /> Biosparging Effective in reducing • Easily • Expected to High <br /> bulk mass of COPCs in implementable; be moderate <br /> gravelly,sandy soil layer . Should take no based on the <br /> but limited in silty and more than six expected level <br /> clayey soil layer, months after of O&M <br /> • May take a long time to completion of pilot activities; <br /> achieve target cleanup test and system • Estimated <br /> goal-, design to begin ROM cost- <br /> • Overall effectiveness- treatment; $0.6 million <br /> moderate No air or POTW • Overall cost <br /> permits needed, effectiveness <br /> minimizing lead - high <br /> time required; <br /> • Overall <br /> implementability- <br /> high <br /> In-situ chemical • Effective in reducing Implementable but Expected to Moderate <br /> oxidation bulk mass of COPCs in require a field pilot be high due to to high <br /> gravelly,sandy soil layer test to complete amount of <br /> but somewhat limited in system design-, oxidant likely <br /> silty and clayey soil Should take no used and the <br /> layer; more than six need to <br /> • May not take as long a months after address the <br /> time as the other completion of pilot COPC in the <br /> altematives to achieve test and system silty and <br /> target cleanup goal; design to begin clayey soil <br /> • Overall effectiveness- treatment; layer,along <br /> moderate to high Fewer permits with the <br /> needed than associated <br /> groundwater pump level of 0&M <br /> and treat and air activities; <br /> sparging with SVE Estimated <br /> -less lead time ROM cost- <br /> before treatment $1.0 million <br /> begins; Overall cost <br /> • May require effectiveness <br /> additional system -moderate <br /> control measures <br /> depending on <br /> permit <br /> requirements; <br /> • Overall <br /> implementability- <br /> moderate to high <br /> (a) The estimated ROM cost for each alternative is determined based on a treatment period of <br /> 15 years (anticipated worst case scenario) and an interest rate of 4% for present worth cost <br /> comparison purposes. <br /> Final FS_Onsae Petroleum Hydrocarbon RenWia0on 5-2 Shaw Environmental,Inc. <br />