Laserfiche WebLink
r <br /> Chronology 515 Charter Way, Stockton <br /> Page 2 <br /> 02/03/00 The SVE system was started this date. Operation of the SVE system was <br /> intermittent due to system shut downs. The system was not operated after <br /> 10/1/04 when it was determined to no longer be effective. <br /> 01/02/02 Date of the SJC/EHD directive letter to submit a work plan to define the site <br /> contamination. <br /> 03/13/02 A work plan was submitted this date and an Addendum was requested. <br /> 04/17/02 An Addendum to the work plan was received this date. <br /> 05/13/02 The work plan Addendum approved this date. <br /> 03/24/03- The work plan was implemented these dates with well installations (MW4R <br /> 04/08/03 S/ D and MW2R and 3R), and groundwater extraction and air sparge tests. <br /> 06/18/03 Date of"Additional Assessment and Remedial Feasibility Test Report" of <br /> work performed in March and April 2003. <br /> 08/18/03 Date of SJC/EHD correspondence responding to 6/18/03 report of findings; <br /> requested clarification of some maps and diagrams and recommended <br /> performing the sparge test again with modification. No response was ever <br /> received. <br /> 06/04/04 Date of SJC/EHD correspondence directing submittal of a work plan by <br /> 07/23/04 to complete definition of the contamination. <br /> 06/09/04 On this date the consultant informed SJC/EHD that the RP had not paid <br /> them so they would not be conducting any more work at the site. <br /> 09/29/04 On this date the consultant informed SJC/EHD that they had lost contact <br /> with the RP, so they would be shutting down the remediation system and <br /> would not be performing any more quarterly groundwater monitoring. <br /> 10/13/04 Date of SJC/EHD correspondence notifying Junius McKelvey that he was <br /> being removed as a responsible party to this site. A file review indicated he <br /> never owned, operated or had any connection to the former UST's. Mr. <br /> McKelvey was never an owner of this property. <br /> 10/13/04 Date of SJC/EHD correspondence informing RP that he is out of <br /> compliance, directing resumption of remediation and quarterly monitoring, <br /> and submittal of the delinquent work plan by 11/08/04. <br /> This letter was returned to SJC/EHD marked undeliverable. <br /> 10/26/04 Date of SJC/EHD correspondence notifying RP that he is out of compliance <br /> and directing resumption of remediation and quarterly monitoring, and <br /> submittal of the delinquent work plan by 11/08/04. <br />