My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Chronology 515 Charter Way, Stockton <br /> Page 2 <br /> 02/03/00 The SVE system was started this date. Operation of the SVE system was <br /> intermittent due to system shut downs. The system was not operated after <br /> 10/1/04 when it was determined to no longer be effective. <br /> 01/02/02 Date of the SJC/EHD directive letter to submit a work plan to define the site <br /> contamination. <br /> 03/13/02 A work plan was submitted this date and an Addendum was requested. <br /> 04/17/02 An Addendum to the work plan was received this date. <br /> 05/13/02 The work plan Addendum approved this date. <br /> 03/24/03- The work plan was implemented these dates with well installations (MW4R <br /> 04/08/03 S/ D and MW2R and 3R), and groundwater extraction and air sparge tests. <br /> 06/18/03 Date of"Additional Assessment and Remedial Feasibility Test Report" of <br /> work performed in March and April 2003. <br /> 08/18/03 Date of SJC/EHD correspondence responding to 6/18/03 report of findings; <br /> requested clarification of some maps and diagrams and recommended <br /> performing the sparge test again with modification. No response was ever <br /> received. <br /> 06/04/04 Date of SJC/EHD correspondence directing submittal of a work plan by <br /> 07/23/04 to complete definition of the contamination. <br /> 06/09/04 On this date the consultant informed SJC/EHD that the RP had not paid <br /> them so they would not be conducting any more work at the site. <br /> 09/29/04 On this date the consultant informed SJC/EHD that they had lost contact <br /> with the RP, so they would be shutting down the remediation system and <br /> would not be performing any more quarterly groundwater monitoring. <br /> 10/13/04 Date of SJC/EHD correspondence notifying Junius McKelvey that he was <br /> being removed as a responsible party to this site. A file review indicated he <br /> never owned, operated or had any connection to the former UST's. Mr. <br /> McKelvey was never an owner of this property. <br /> 10/13/04 Date of SJC/EHD correspondence informing RP that he is out of <br /> compliance, directing resumption of remediation and quarterly monitoring, <br /> and submittal of the delinquent work plan by 11/08/04. <br /> This letter was returned to SJC/EHD marked undeliverable. <br /> 10/26/04 Date of SJC/EHD correspondence notifying RP that he is out of compliance <br /> and directing resumption of remediation and quarterly monitoring, and <br /> submittal of the delinquent work plan by 11/08/04. <br />
The URL can be used to link to this page
Your browser does not support the video tag.