My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:59:18 PM
Creation date
3/4/2019 1:23:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tentative Field Implementation Schedule for Installation and Operation of <br /> the AS/SVE Treatment System at The Transmission Shop Site in Stockton, CA <br /> Duration <br /> Key Activity Description <br /> Early Start Early End <br /> Equipment, material, and resource procurement 11/2/2009 4/26/2010 <br /> Permitting(air emissions,well installation, and electrical/gas connection) 11/2/2009 5/1/2010 <br /> Site preparation and initial setup(including utility clearance) 12/1/2009 12/11/2009 <br /> System construction (well drilling,piping,electrical oo up, and equipment installation, <br /> 12/14/2009 5/3/2010 <br /> System testing and startup/shakedown 5/3/2010 5/17/2010 <br /> Routine system operation and monitoring(including quarterly and semiannually 5/17/2010 5/16/2013 <br /> groundwater well sampling); <br /> System shutdown with one-year quarterly monitoring TBD TBD <br /> System decommissioning TBD TBD <br /> Note: <br /> Early start of the project is contingent upon receipt of notice to proceed from the client. <br /> A 6-month period is assumed for the electrical and possibly natural gas connections,from permit application <br /> to,final hookup. This time period is considered maximum but also typical based on other project experience <br /> involving PG&E. The actual time required may, however, be less but remains contingent upon PG&E's <br /> schedule after receipt of the permit application. <br /> System treatment period is assumed 3 years at a minimum <br /> TBD- To be determined later based on treatment progress results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.