My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
515
>
2900 - Site Mitigation Program
>
PR0527799
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 2:43:14 PM
Creation date
3/4/2019 1:26:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527799
PE
2960
FACILITY_ID
FA0018844
FACILITY_NAME
TRANSMISSION STORE
STREET_NUMBER
515
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
14707408
CURRENT_STATUS
01
SITE_LOCATION
515 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 0 0 <br />5.5 Derived Waste Handling <br />Soil cuttings, if any, from drilling will be placed in a closed -top drum. Groundwater purged <br />during sampling and wash water generated during decontamination will be disposed of in closed - <br />top drums. Upon completion of field work, representative soil and water samples will be <br />collected for waste analysis and disposal. <br />5.6 Post -Activity Documentation <br />■ Shaw will incorporate the results of the pilot test into the final design of the in-situ biosparge <br />treatment system. The design will be presented in the Final Remediation Plan (FRP) of the <br />Corrective Action Plan for the site. Preparation of the FRP will be in accordance with <br />CVRWQCB recommendations pertaining to UST site cleanup (CVRWQCB, 2004). The FRP <br />will include discussions of the following additional topics: <br />• Implementation Schedule <br />' System Construction <br />• Startup Testing <br />' Routine Operation and Maintenance <br />• Performance Monitoring, Evaluation, and Reporting <br />• System Decommissioning <br />The FRP will be submitted to CVRWQCB for review. Upon receipt of approval from <br />CVRWQCB to proceed, implementation of the Corrective Action Plan will follow. <br />Biosparge Plot Test Final doc 5-3 Shaw Environmentat Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.