My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
3500 - Local Oversight Program
>
PR0544216
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 5:53:12 PM
Creation date
3/4/2019 2:07:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544216
PE
3528
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
02
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Denis Brown <br /> Re: 620 W. Charter Way, Stockton,`CA <br /> Page 2 of 2 <br /> • MW-12-77 would be installed onsite, approximately 25 feet south of MW-7; <br /> • MW-13-77 would be installed adjacentf to MW-13-50 at the northern premises of Best <br /> Western Motel,approximately 60 feet east of MW-7; <br /> • MW-14-77 would be installed adjacent to MW-14-50 in the parking lot of Best Western <br /> Motel, approximately 55 feet east, southeast of MW-5; <br /> • MW-15-77 would be installed adjacent to MW-15-50 north of West Charter Way at the <br /> southwest corner of Delta Market,approximately 27 feet southeast of MW-10; <br /> 0 MW-16-77 would be installed onsite, approximately 20 feet northeast of MW-8; <br /> Cambria proposes to install one deep well,MW-16-90, located between MW-9 and MW-4. <br /> EHD approves the installation of thirteen monitoring wells at various depths to further assess the <br /> petroleum hydrocarbon contamination in the groundwater plume, and the advancement of CPT-18 <br /> to an approximate depth of 100 feet bgs while collecting approximately five soil and groundwater <br /> samples for chemical analysis. During the monitoring well installations, soil samples will be <br /> collected at five-foot intervals for soil characterization to a depth of ten feet above the proposed <br /> screen interval below which continuous soil samples will be collected to ensure the screen interval <br /> .for each well is appropriately located based on soil types, and to avoid providing a potential <br /> migration pathway between sand intervals.. Soil will be logged once in the shallow depths for <br /> monitoring wells with various total depths installed adjacent to each other. Soil and groundwater <br /> samples will be analyzed for total petroleum hydrocarbons quantified as gasoline (TPH-g), <br /> benzene, toluene, ethylbenzene and total xylenes (BTEX), methyl tert-butyl ether (MTBE), tert- <br /> .butyl alcohol(TBA), and 1,2-dichloroethane(1,2-DCA). <br /> Please submit a boring permit application for each parcel, access agreements, and permit fees of <br /> $89 per application to EHD by January 19, 200OContact Vicki McCartney at(209)468-3456 or at <br /> vmccartney(i sicelld.com if you have any questions regarding this letter. <br /> Donna Heran,REHS,Director <br /> Environmental Health Department <br /> cil <br /> Victoria L. McCartney, Senior REHS. Nuel C. Henderson,Jr.,PG <br /> Unit IV, Site Mitigation Engineering Geologist <br /> Unit IV, Site Mitigation <br /> c: James L.L.Barton,PG—CVRWQCB <br /> Mike Murphy—Cambria <br />
The URL can be used to link to this page
Your browser does not support the video tag.