Laserfiche WebLink
i <br /> i <br /> CAMBRIA <br /> SCHEDULE <br /> Cambria is prepared to initiate this work upon approval of this work plan by SJCEHD. The <br /> actual date of field work is contingent on driller availability and receipt of permits and access <br /> agreements. <br /> CLOSING <br /> If you have any questions regarding the contents of this document, please call Mike Murphy at <br /> (707)933-2367. <br /> Sincerely, <br /> Cambria Environmental Technology, Inc. <br /> Mike Murphy <br /> Project Manager 'eW N <br /> M <br /> Joe W.Neely,PG <br /> Senior Project Geologist - � <br /> Figure 1. Vicinity Map <br /> Figure 2. Proposed Soil Boring and Well Location Map <br /> cc: Denis Brown, Shell Oil Products US,20945 S. Wilmington Ave.,Carson,CA 90810 <br /> James Barton, Central Valley Regional Water Quality Control Board, 11020 Sun Center <br /> Drive,#200,Rancho Cordova, CA 95670 <br /> Nick Goyal(property owner),41805 Albra Street,2nd Floor,Fremont,CA 94558 <br /> KAStockton 620 W Charter Way\WORK PLANS\work Nov06\Work plan Oct 06.doc <br /> �I <br /> 0778 5 <br />