Laserfiche WebLink
LEGEND <br /> MV-1 Y MONITORING WELL LOCATION k DESIGNATION <br /> IN • SOIL PROBE BORING LOCATION k DESIGNATION <br /> O CONDUCTOR CASING LOCATION <br /> CPT1 0 CPT BORING LOCATION k DESIGNATION <br /> VW-1 )1I SOI. VAPOR MMRACTION WELL LOCATION <br /> GR' k DESIGNATION <br /> 41 S,TOOG Gy-1♦ GROUND RATER EYTRACTION MEIL LOCATION <br /> k DESIGNATION <br /> VI-4 )& PROPOSED WE WELL LOCATION <br /> • NEWER (DISCHARGE POINT) <br /> MW-2 �(VW-2 �1 \�� - REMEDIATION ENCLOSURE <br /> REMEDIATION PIPING k DPE 17Or DIRECTION <br /> M -1 PUMP ISLAND DET PmwG / CONDUIT LOCATION 1 <br /> 1 11 ,11 <br /> 1 L3 MW-B-~ <br /> 1 , 9 - <br /> -_- <br /> . - - �-rUMI' ISLAND <br /> APPROXIMATE LIMITSEW-2 <br /> _1 <br /> OF FORMER USTS EW-1 VW-3 DRAY <br /> APPROXIMATE LIMITS SIDO" <br /> OF NEW UST Slb, DIVEV Y <br /> moi' <br /> CHARTER WAY t <br /> 4 <br /> N <br /> SCALE <br /> 20 40 <br /> FEET <br /> PROPOSED INTERIM REMEDIATION SITE PLAN &Advanced <br /> SUPER CENTER MART GeoEnvironmenof AW-0mv CAMWA& 1, Inc. <br /> 701 EAST CHARTER WAY PROJECT NO.AGE-NC-oB-1489 TILE: SCM-DPE ITGURE: <br /> STOCKTON, CALIFORNIA DATE: 20 JUNE 2008 DRAWN BY: MAC 10 <br />