Laserfiche WebLink
3 TO 6-INCH ASPHALT CAP <br /> 1—INCH DIAMETER SCHEDULE 40 PVC PIPE <br /> DUAL PHASE EXTRACTION PIPE <br /> HEIGHT = 18—INCHES <br /> 3. <br /> 2—INCH DIAMETER SCHEDULE 40 PVC PIPE <br /> t•' `{.' ''e SECONDARY PIPE CONTAINMENT <br /> WIDTH = 18-INCHES <br /> IMPORTED ROAD-BASE SAND <br /> PROPOSED INTERIM REMEDIATION TRENCH DETAILS Advanced <br /> GeoEnvironmental, Inc. <br /> SUPER CENTER MART oz <br /> 701 EAST CHARTER WAY PROJECT NO.AGE—NC-06-1483 FILE: PIPE—TRCH G ' <br /> STOCKTON CALIFORNIA DATE: 20 JUNE 2008 DRAWN BY: 11AC 11 <br />