My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
701
>
3500 - Local Oversight Program
>
PR0544217
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2019 11:52:48 PM
Creation date
3/4/2019 4:23:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544217
PE
3526
FACILITY_ID
FA0002512
FACILITY_NAME
GSG GAS & MART
STREET_NUMBER
701
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734311
CURRENT_STATUS
02
SITE_LOCATION
701 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTODEPARTMENT <br /> °PQ",N. SAN JOAQUIN COUNTY <br /> is Donna K.Heran,R.E.H.S. Unit Supervisors <br /> Director 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> AI Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> (q,, �P • Program Manager Douglas W.Wilson,R.E.H.S. <br /> ��FOR` Laurie A.Corolla,R.E.H.S. Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S. <br /> Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> KHALDOON OTHMAN SEP 2 8 nob <br /> 701 E CHARTER WAY <br /> STOCKTON CA 95206 <br /> RE: K & S Gas & Grocery Site Code: 2512 <br /> 701 E Charter Way <br /> Stockton, CA <br /> San Joaquin County Environmental Health Department (EHD) has reviewed Quarterly <br /> Report — First Quarter 2005 (QR), dated 21 July 2005, prepared and submitted by <br /> Advanced GeoEnvironmental, Inc. (AGE) on your behalf for the groundwater monitoring <br /> event conducted 16 March 2005. In addition, EHD has reviewed site records and data <br /> for this site. EHD comments as follows: <br /> Contaminant concentrations reported in the QR were as high as 980,000 micrograms <br /> per liter (µg/I) total petroleum hydrocarbons quantified as gasoline (TPH-g), 100,000 µg/I <br /> benzene, 290 µg/I methyl tert-butyl ether (MTBE) and 14 ltg/I 1,2-dichloroethane (1,2- <br /> DCA). The concentrations of these and other contaminants not noted here exceed the <br /> maximum contaminant level (MCL) for each contaminant established by the Department <br /> of Health Services (DHS) for public drinking water. The QR notes that the vertical and <br /> lateral extents of the contaminants have not yet been delineated. <br /> By letter dated 03 September 2002, EHD had approved your work plan dated 16 July <br /> 2002, as modified during a 19 August 2002 conversation with your consultant, for <br /> installation of 5 multi-level and 3 single completion ground water monitoring wells to <br /> assess and monitor impacted ground water on and near the site. The multi-level wells <br /> were to be completed across four depth intervals generally as follows: 28 to 48 feet <br /> below surface grade (bsg), 80 to 85 feet bsg, 109 to 119 feet bsg and 140 to 150 feet <br /> bsg. The four single completion wells were to be screened across first ground water, <br /> generally 28 to 48 feet bsg. During March 2004, three of the proposed wells were <br /> installed, MW-7 (single completion) and MW-8 and MW-9, both multilevel wells. <br /> Installation of the remaining five wells was postponed to reevaluate and modify the work <br /> plan, if necessary, due to access problems. <br /> It has been 18 months since the fieldwork was interrupted and EHD has not yet received <br /> a work plan addendum or notification that the remaining work in the work plan approved <br /> three years ago was going to be completed. Your plume is not defined and the <br /> concentrations reported in the quarterly reports are of significant concern. You are <br /> directed to submit to EHD no later than 14 November 2005 a work plan addendum or <br /> notification that the remaining scope of work in the approved work plan will be <br /> implemented within 60 days of date of this letter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.