Laserfiche WebLink
r <br /> AGENDA <br /> 749 East Charter Way, Stockton, California <br /> 07 March 2006 <br /> San Joaquin County Environmental Health Department <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, California <br /> Introductions and sign in. <br /> Purpose of meeting <br /> • Establish regulatory objectives to achieve site closure <br /> • Review site status <br /> • Identify impediments to achieving site closure <br /> • Establish milestones to progress toward site closure <br /> • Set schedule for meeting regulatory directives and milestones <br /> Regulatory Objectives <br /> • Obtain site closure <br /> • Fully characterize the site and the contaminant release <br /> • Reduce risk level site poses to human health and groundwater to a level <br /> acceptable for site closure — this is a risk management problem. <br /> • Region 2 ESLs, CHSSLs, vapor intorsion issues. <br /> Site Status <br /> • Vertical delineation of impacted groundwater not complete <br /> • Confirmation of SVE cleanup not complete <br /> • Groundwater remediation not complete <br /> • Now need review of ESLs, CHSSLs and potential for vapor intrusion evaluation <br /> Impediments to Progress Toward Site Closure <br /> • Late and inadequate reports and work plan <br /> I <br /> • SVE report due 01 March 2006 not submitted, others as noted below. <br /> Milestones <br /> • Test soil vapor extraction system — confirmation borings directed in April 2004, <br /> testing vapor wells and system directed in September 2005 — No acceptable work <br /> plans submitted or implemented to date <br /> • Initiate interim groundwater remediation — directed in September 2003 and in <br /> September 2005 — no acceptable work plan submitted or implementation to date <br /> • Complete vertical delineation of impacted groundwater — directed in September <br /> 2003 and earlier <br />