My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:50:04 AM
Creation date
3/5/2019 9:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> AGENDA <br /> 749 East Charter Way, Stockton, California <br /> 07 March 2006 <br /> San Joaquin County Environmental Health Department <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, California <br /> Introductions and sign in. <br /> Purpose of meeting <br /> • Establish regulatory objectives to achieve site closure <br /> • Review site status <br /> • Identify impediments to achieving site closure <br /> • Establish milestones to progress toward site closure <br /> • Set schedule for meeting regulatory directives and milestones <br /> Regulatory Objectives <br /> • Obtain site closure <br /> • Fully characterize the site and the contaminant release <br /> • Reduce risk level site poses to human health and groundwater to a level <br /> acceptable for site closure — this is a risk management problem. <br /> • Region 2 ESLs, CHSSLs, vapor intorsion issues. <br /> Site Status <br /> • Vertical delineation of impacted groundwater not complete <br /> • Confirmation of SVE cleanup not complete <br /> • Groundwater remediation not complete <br /> • Now need review of ESLs, CHSSLs and potential for vapor intrusion evaluation <br /> Impediments to Progress Toward Site Closure <br /> • Late and inadequate reports and work plan <br /> I <br /> • SVE report due 01 March 2006 not submitted, others as noted below. <br /> Milestones <br /> • Test soil vapor extraction system — confirmation borings directed in April 2004, <br /> testing vapor wells and system directed in September 2005 — No acceptable work <br /> plans submitted or implemented to date <br /> • Initiate interim groundwater remediation — directed in September 2003 and in <br /> September 2005 — no acceptable work plan submitted or implementation to date <br /> • Complete vertical delineation of impacted groundwater — directed in September <br /> 2003 and earlier <br />
The URL can be used to link to this page
Your browser does not support the video tag.