My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:50:04 AM
Creation date
3/5/2019 9:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
749 E. Charter Way <br /> March 2006 Meeting Agenda <br /> Page 2 of 2 <br /> Schedule <br /> SVE System / Vapor Wells Testing <br /> • Work plan to be submitted - toll K w{ 3 f 71r7� 3l 7/d b <br /> • Review of WP for SVE system — Within 30 days of submittal <br /> • Implementation of SVE system testing — <br /> Complete Vertical (and lateral?) delineation of dissolved plume ?tJ )k Z <br /> • Submit work plan for well(s) for vertical delineation — 3 /Zy /® <br /> • Review work plan — within 30 days of submittal <br /> • Implement approved work plan — within 75 days of approval <br /> 1 <br /> Interim Groundwater Remediation {' S 21, k 7 d� j s G 3/431 <br /> �0G <br /> • Submit feasibility study — <br /> • Review feasibility study — within 30 days of submittal <br /> • Submit work plan for pilot testing — within 60 days of feasibility study approval <br /> • Review of pilot testing — within 30 days of submittal <br /> • Implementation of pilot study — within 75 days of work plan approval <br /> • Submit report of findings and additional work plan or remediation system design <br /> — within 60 days of receipt of laboratory data from field work <br /> • <br /> Review, . ' Implement . , , . <br />
The URL can be used to link to this page
Your browser does not support the video tag.