749 E. Charter Way <br /> March 2006 Meeting Agenda <br /> Page 2 of 2 <br /> Schedule <br /> SVE System / Vapor Wells Testing <br /> • Work plan to be submitted - toll K w{ 3 f 71r7� 3l 7/d b <br /> • Review of WP for SVE system — Within 30 days of submittal <br /> • Implementation of SVE system testing — <br /> Complete Vertical (and lateral?) delineation of dissolved plume ?tJ )k Z <br /> • Submit work plan for well(s) for vertical delineation — 3 /Zy /® <br /> • Review work plan — within 30 days of submittal <br /> • Implement approved work plan — within 75 days of approval <br /> 1 <br /> Interim Groundwater Remediation {' S 21, k 7 d� j s G 3/431 <br /> �0G <br /> • Submit feasibility study — <br /> • Review feasibility study — within 30 days of submittal <br /> • Submit work plan for pilot testing — within 60 days of feasibility study approval <br /> • Review of pilot testing — within 30 days of submittal <br /> • Implementation of pilot study — within 75 days of work plan approval <br /> • Submit report of findings and additional work plan or remediation system design <br /> — within 60 days of receipt of laboratory data from field work <br /> • <br /> Review, . ' Implement . , , . <br />