My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:50:04 AM
Creation date
3/5/2019 9:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Beneto Facility Page 2 <br /> 749 East Charter Way April 13 , 2012 <br /> Stockton , California 95202 <br /> • Analyzing groundwater samples for total petroleum hydrocarbons as gasoline (TPHg) ; <br /> benzene, toluene , ethylbenzene and total xylenes (BTEX) ; methyl tertiary-butyl ether <br /> (MTBE) , ethyl tertiary-butyl ether (ETBE) , tertiary-amyl methyl ether (TAME) , di- <br /> isopropyl ether (DIPE) and tertiary butyl alcohol (TBA); and soil gas samples for TPHg , <br /> BTEX and MTBE; <br /> • Storing evacuated groundwater in an on-site holding tank, pending analytical results <br /> from the California-State-certified laboratory. <br /> Considering the screen interval of MW-5 , the most impacted well , is 45 to 65 feet below <br />'I surface grade (bsg) and groundwater is currently at approximately 28 to 29 feet bsg , the EHD <br /> believes it is unlikely that any vapor will be extracted from MW-5, and most vapor will be <br /> recovered from MW- 1 . The EHD approves the work plan as submitted . <br /> Following the DPE pilot test, submit a report of findings to the EHD within sixty days of <br /> completing the study. Include a cost estimate for implementing a DPE remediation system if <br /> results from the pilot study are favorable. <br /> If you have any questions, please contact Vicki McCartney at (209) 468-9852 or by email at <br /> vmccartney@sjcehd . com . <br /> Sincerely, <br /> Victoria L. McCartney, REHS U Nuel C. Henderson , Jr. , PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: Mr. Dan Lafontaine , PG , Apex Envirotech , Inc. , 11244 Pyrites Way , Gold River, <br /> California 95670 <br /> Mr. James L . L. Barton , PG , California Regional Water Quality Control Board Central <br /> Valley Region , 11020 Sun Center Drive , Suite 200 , Rancho Cordova , California 95670 <br /> Mr. Muhammad Rizwan , 4917 Tiller Ct. , Stockton , California 95206 <br />
The URL can be used to link to this page
Your browser does not support the video tag.