My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
3500 - Local Oversight Program
>
PR0544218
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2019 9:50:04 AM
Creation date
3/5/2019 9:27:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544218
PE
3526
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
02
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Darpetro, Inc. Page 2 <br /> 749 E. Charter Way 13 March 2008 <br /> Stockton, CA <br /> • Quarterly monitoring of deep monitoring wells MW-17B and MW- 18C <br /> should continue to fully evaluate whether or not the vertical extent of <br /> impacted groundwater has been delineated ; <br /> • AEI will prepare an evaluation of potential remediation methods to address <br /> impacted groundwater and recommend the preferred approach in a report <br /> to the EHD ; and <br /> • AEI will review existing data and estimate the contaminant mass removed <br /> during the past SVE operation . <br /> Submit the SCM review/revision and associated work plan , if appropriate , to the <br /> EHD by 01 June 2008 ; include in the document the estimate of the contaminant <br /> mass dissolved in groundwater, the undissolved contaminant mass in soil , the <br /> estimated contaminant mass removed by the SVE system , and the results and <br /> recommendations from the recent SVE test. By 01 July 2008 , submit to the EHD <br /> the evaluation of potential remediation methods to address impacted <br /> groundwater and a recommendation of which method to utilize on your site. <br /> Install the previously approved MW- 15 during the second quarter of 2008 for <br /> monitoring in the third quarter; if AEI believes other wells should be installed at <br /> the same time , submit a work plan addendum with the technical justifications for <br /> the wells . <br /> Questions or comments may be directed to Nuel Henderson , Engineering <br /> Geologist, at (209) 468-3436 . <br /> Sincerely, <br /> Nuel C . Henderson , Jr. , PG Margaret Lagorio, REH <br /> Engineering Geologist Program Coordinator <br /> C : J . Barton — CVRWQCB; 11020 Sun Center Dr. #200, Rancho Cordova , CA 95670 <br /> D. Lafontaine — AEI ; 11244 Pyrites Way, Gold River, CA 95670 <br /> D . Van Allen — AEI ; 3446 N . Golden State Blvd. , Ste, C ; Turlock, CA 95382 <br /> Meeting Summary and Directive Letter 0308.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.