Laserfiche WebLink
b <br /> CALIFORNIA GEOPHYSICAL GROUP , INC . <br /> P . O . Box 578341 , Modesto , CA 95357 Tei : (209) 527- 1247 <br /> May 27 , 2005 2005 JUN - 2 PH 2F(d: (209) 527-4810 <br /> S ,'A " JC1 ,1AU H COU ' 4TY <br /> Environmental Health Department H411i Of NfFdTnl <br /> San Joaquin CountyHEAL "f 'n LEPARTMENT <br /> 304 East Weber Avenue Third Floor <br /> Stockton, CA 95202-2708 <br /> Attn : Mr. Nuel Henderson <br /> Re : Amended Work Plan to Work Plan dated October 16, 2004 <br /> Beneto Tank Lines , 749 East Charter Way, Stockton , CA Site No. 1060 <br /> California Geophysical Group has been contracted by Beneto Tank Lines to act as their <br /> Environmental Consultant for this site . The following work will be performed to determine the <br /> source of the hydrocarbon contamination . <br /> HISTORY <br /> On November 14 , 1989 three tanks were removed at this site and three fiberglass tanks were <br /> installed . The laboratory results taken at the time of removal tested positive for gasoline <br /> hydrocarbon contamination . <br /> On December 19, 1989 an Electromagnetic Induction Survey was conducted on the site to aid the <br /> investigation of the aerial extent of the contaminated soil and in planning the position of the <br /> monitoring wells . <br /> In January 1990 three monitoring wells were installed . They were reported in our report dated <br /> February 9 , 1990. <br /> In March and April 1992 , three more monitoring wells were installed . They were necessary <br /> because the groundwater had fallen below the depth of the original wells . This work was reported <br /> in our report dated April 30 , 1992 . <br /> In July 1993 we installed two additional monitoring wells and drilled one boring . This work was <br /> reported in our report dated August 24 , 1993. <br /> In September 1994, we installed three additional monitoring wells. This work was reported in our <br /> report dated October 10 , 1994. <br /> In April 1995 we drilled two CPT borings and they were reported in our report dated March 15 , <br /> 1995. <br /> In February and March , 1996 five vapor extraction wells , one air sparging well and one boring <br /> were installed at this site. This work was reported in our report dated March 19 , 1996 . <br /> In April 1996 we drilled two additional CPT borings. They were reported in our report dated June <br /> 10 , 1996 . <br />