Laserfiche WebLink
History <br /> On November 14, 1989 three tanks were removed at this site and three fiberglass tanks <br /> were installed. The laboratory results taken at the time of removal tested positive for <br /> gasoline hydrocarbon contamination. <br /> On December 19, 1989 an Electromagnetic Induction Survey was conducted on the site to <br /> aid the investigation of the aerial extent of the contaminated soil and in planning the <br /> position of the monitoring wells. <br /> In January 1990 three monitoring wells were installed. They were reported in our report <br /> dated February 9, 1990. <br /> In March and April 1992, three more monitoring wells were installed. They were <br /> necessary because the groundwater had fallen below the depth of the original wells. This <br /> work was reported in our report dated April 30, 1992. <br /> In July 1993 we installed two additional monitoring wells and drilled one boring. This <br /> work was reported in our report dated August 24, 1993 . <br /> In September 1994, we installed three additional monitoring wells. This work was <br /> reported in our report dated October 10, 1994 . <br /> In April 1995 we drilled two CPT borings and they were reported in our report dated <br /> March 15, 1995 . <br /> In February and March, 1996 five vapor extraction wells, one air sparging well and one <br /> boring were installed at this site. This work was reported in our report dated March 19, <br /> 1996 , <br /> In April 1996 we drilled two additional CPT borings. They were reported in our report <br /> dated June 10, 1996 , <br /> In July 1999, we drilled an additional monitoring well MW42 to 80 feet. This was <br /> reported in our report dated August 5 , 1999. <br /> On November 6, 2000 we drilled two borings (13-2 and B-3) to a depth of 90 Feet Bgs <br /> and 100 Feet Bgs. This was reported on our report dated December 14, 2000. <br /> On November 17, 2003 , we submitted a Amended Site Concept Model. <br /> On July 20, 2005, we drilled one boring and two monitoring well (134, MW- 14 and MW= <br /> 16) to a depth of 158 feet bgs for the borings and 50 feet bgs for the two monitoring <br /> wells. This was reported in the Drilling Report dated August 24, 2005 . <br />